Laserfiche WebLink
3. At least 2 yeaxs of opention from 5 wind hubines <br /> 4.9 Compliance with Building Codes: Pe�it applications for Distributed Wind Enecgy Systems <br /> sliall comply with all applicable state and local building codes. <br /> 4.9.1 Tower and foundation drawings provided by the manufacturer or the project <br /> developer shall be submitted with the applicatioa Independent enginee:ing review <br /> aad wet-stamped drawings shall not be required for Distributed Wind Eneigy System <br /> Up to aud Including 100 kW,but may be iequired Eor all other Distributed Wind <br /> Energy Systems. <br /> 4.9.2 Applications foc roof-mounted(or othec noa-uadiaoaally mounte�hubiaes shall <br /> include a wet-stamped stnutural engineeriag aaalysis for the turbine mountiag <br /> system and for the suitability of the buildiag ro which the tuibine is to be mounted. <br /> 4.10 Compliance with FAA Regulations: Distabuted Wind Energy Systems must comply with <br /> applicable FAA regulations, iacluding any necessazy appmvals foc iustallations close to <br /> aitports. <br /> 4.11 Compliance with National Electrical Code(NEG): The installation of a Distributed Wind <br /> Enetgy System shall comply with section 694(or tlie most-current applicable sectioa,if <br /> update�of the NEC. Applications must be accompanied by a siogle-line drawing of the <br /> dectacal compoaents in sufficient detail to allotv for a detP�+++���don that the manner of <br /> installation confocros to the NEC. Wet-stamped drawings shall not be required for <br /> Distributed Wind Energy System Up to and Iucluding 100 kW. <br /> 4.12 Utility NotiScation: No gud-tied Distributed Wind Eneigy System shall be installed until <br /> evidence has been submitted tk�at the applicant's utility company has bem infom�ed of the <br /> custome�s iatent to install aa interconnected customec-owned generdtor. <br /> 4.13 Anteanas: Wind tucbine Towe�s installed uoder this ocdinance may also be used to host <br /> antenaas, so long as the stiucture is shawn to meet the state and local stcuctural code <br /> requirements. <br /> 4.14 Fee: The building pe�it fee frn a Distabuted Wind Enetgy System shall follow the esisting <br /> fee stcuctuce for pe�its required of otl�er stiuchues in the apptopriate district. In the <br /> absence of such ke stsuctuce,the pemvt fee for a Distdbuted Wind Eneigy System shall not <br /> eaceed;20 pec kW of Rated Power Output or a maaimum of;1500. Additional charges for <br /> inspections shall apply at the standacd rate used for other structures. <br /> 4.15 Decoaunissioning: A Distributed Wimd Ene�System that has reached the end of its useful <br /> life shall be mmoved within 6 montl�s of such determinatioa A Distributed Wind Energy <br /> System is considered to have reached the end of its useful life when it has been inoperable <br /> for 12 consecutive montl�s. Time eatensions are alloaved when good faith efforts to repaic <br /> the turbine can be demonstrated. Foundations aeed not be removed. <br /> Distributed Wind Model Zoning Ordinance-February 2014 Page 4 <br />