Laserfiche WebLink
MAC WINL .tCY SYSTEMS TECHNICAL COMMITTEB FIIVAL RRART:12/IS/2009 MAC N'IND ENERGY SYSTEMS TECHMCAL COMMITTEE FINAL DRA '1�1��4 <br /> SMALL WIND ENERGY CONVER3ION SYSTEMS 3MALL WIND ENERCY CONVERSION 3Y9TEM3 <br /> MODEL ORDINANCE 1NODEL ORDINANCE <br /> 12.Utility Notification:The[Ciry/County]shall notify the utility of receipt of en application and/or protect access to sufficient wind as may or may not be necessary to operate the <br /> to install an interconnected customer-owned generator.Off-grid systems shell be exempt SWECS. <br /> from this notification requirement. <br /> 21.Insurance: The owner/operator of a SWECS must demonstrate and maintain liability <br /> l3.Interconnection: The S WECS, if not ofF grid, shall meet the requiroments for insurance of not less than E coverage. <br /> interconnection and operation as set forth by the utility and the lowa utilities board. No <br /> permit of any kind shall be issued until the[City/County]has been provided with a copy 22.Engineer Certification:Applications for any SWECS shall be accompanied by stendard <br /> of an executed interconnection agrcement. Off-grid systems shall be exempt from this drawings of the wind wrbine structure, including the tower, base, and footings. An <br /> requirement. engineering analysis of all components of the SWECS showing compliance with the <br /> applicable regulations and certified by an lowa licensed professional engineer shall also <br /> l4.Restriction On Use Of Electricity Generated: A SWECS shall be used exclusively to be submitted. <br /> supply electrical power to the owner for on site consumption,except that excess electrical . <br /> power generated by the SWECS and not presently needed for use by the owner may be 23.Installation: Installation must be done according to manufacturer's recommendations. <br /> used by the utility company in accordence with Section 199, Chapter 15.11(5)of the All wiring and electrical work must be compteted according to the applicable building <br /> Iowa Administrative Code,as may be subsequently amended. and electric codes. All eleclrical components must meet code recognized test standards. <br /> 15.Noise:A SWECS shall be designed,installed and operated so that the noise generated 24.Removal:If the SWECS remains nonfunctional or inoperetive for a continuoua period of <br /> daes not exceed the maximum noise levels established elsewhere in the[City/CounryJ six (6) months, the system shall be deemed to be abandoned. The SWECS <br /> code. owner/operator shall remove the abandoned system at their expense. Removal of the <br /> system includes the entire struchue, trensmission equipment and fencing f�om the <br /> 16.Shadow Flicker:No SWECS shall be instal(ed and operated so to cause a shadow flicker property excluding foundations. Non-function or lack of operation may be proven by <br /> to fall on or in any existipg residentisl sdvcture. reports from the interconnected urility.For off-grid systems the[City/County]shall heve <br /> the right to enter the property at its sole discretion to determine if the off-grid system is <br /> l7.Safety Controls: Each SWECS shall be equipped with both an automatic and manual generating power.Such generation may be proven by use of an amp meter.The SWECS <br /> braking,goveming,or feathering system to prevent unconuolled rotation,over-speeding, owner/operator and successors shall make available to the Director of <br /> and excessive pressure on the tower suucture,rotor blades,ot turbine components. Said or their designee all reports to and from the purchaser of energy from <br /> eutometic braking system shell also be capable of stopping turbine rotation in the event of the SWECS if requested.If temoval of towers and appurtenant facilities is required,the <br /> a power outage so as to prevent back feeding of the grid. Director of or designee shall notify the SWECS owner/operatar. <br /> Removal shall be completed within six (6)months of written notice to remove being <br /> l8.Shut Off:A clearly marked and easily accessible shut off for the wind turbine will be provided to the owner/operator by the[Ciry/County]of <br /> required as detetmined by the[Fire Marshal/Building O�ciaUCommunity Development <br /> Director]. . 25.Right Of Entrance:As a condition of approval of a[Conditional/Special UseJ use permit <br /> en applicant seeking to install SWECS shall be required to sign e petition and waiver <br /> 19.Electromagnetic Interference:All SWECS shall be designed and consttucted so as not to agreement which shall be recorded and run with the land granting permission [o the <br /> cause radio and television interference. If it is determined that the SWECS is causing [City/CounryJ of to enter the property to remove the SWECS pursuant <br /> electromagnetic interference, the ownedoperator shall take the necessary corrective to the tertns of apptoval and to assure compliance with the other conditions set forth in <br /> action to eliminate this interference including relocation or removal of the facilities, the permit. Removal shall be at the expense of the owner/operator and the cost may be <br /> subject to the approval of the appropriate [Crry/County]suthority.A permit granting a assessed against the property. <br /> SWECS may be revoked if electromagnetic interference from the SWECS becomes <br /> evident. 26.Feasibility Study:It is highly rewmmended that a feasibility study be mede of any site <br /> . prior to installing a wind turbine.77�e feasibility study should include measuring actual <br /> 20.Wind Access Easements:The enactment of this chapter does not constitute the granting wind speeds at the proposed turbine site for at least 3 months. <br /> of an easement by the [Crty/County]. The SWECS owner/operator shall have the sole <br /> . responsibility to acquire any covenants,easements,or similar dceumentation to assure <br /> c�a�..�+..ase�W�.erov.ds.m�nr.mw.>��•�c,M.tioa�vsoRerm�nainonucvn�a�.sa.io�aa� Pege 4 of 7 c��n�as.�eni��o���w+�*aw�.r�+F+�^w"�^�e'�^011T1�P'iid"1pWOid°°` Page 5 of 7 <br />