My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03-09-2015 Council Packet
Orono
>
City Council
>
2015
>
03-09-2015 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/2/2015 3:18:37 PM
Creation date
4/2/2015 3:18:00 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
488
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Section 11.01:Zoning Ordinance Sxdon 11 Ol:Zoning Ordmence <br /> Subdivis�on 9.4 Utility and Communicatlon Uses Subdivision 9.4.Utility and Communication Uses <br /> wind energy facilities may periodically exceed allowable noise levels during extreme temporary tower shall be removed within thirty(30)days from the cessation of <br /> wind events(winds above 30 mph or greater). operation at the site. <br /> o. Utility Comnanv Interconnecrion.No WECS shall be interconnected with a lacal c. 'fhe tower shall be temporary by nature and at�all not have permanent foundations. <br /> electrical utility company until the utility company has reviewed and comments upon Guy wires may be used as bng as t6e connecdons to the ground are temporary and <br /> it.All connections shall be underground. the wires are designed to support the wind and ice load of the tower. <br /> p. Comnliance with State Building Code.A standard drawing of the at�uctural d. T6e tower shall mcet the minimum wind and ice load design required by the City <br /> components of the wind energy conversion system and support sltucmres,including Code and the Unifortn Building code. <br /> base and footings shall be provided along with engineering date and calculations to e. The tower and any related guy wires shall be protected against unauthorizecl <br /> demonstrate compliance with the structural design provisious of the State Building climbing. <br /> Code.Drawings and engineering calculations shall be certified by a registered <br /> engineer. f. 1'he tower shall be set back a distance at least equal to its height from any lot line, <br /> q. Compliance with National Electrical Code.WECS elecvical equipment and <br /> recreaUonal field,dwelling,school,business or other habitable structure. <br /> connection shall be designed and installed in adherence to the National Electrical g. The tower shall be grounded and shielded to protect against natural lightning strikes, <br /> Code. in conformance with the Nadonal Elecaical Code. <br /> r. Manufacturer Wazrantv.The applicant shall provide documentaflon or other evidence h. No tower shall t�ave affued or attached lights,reflectors,flashers or any other <br /> from the dealer or manufacturer that the WECS has been successfully operated in illuminadon,except for those devices required by the Federal Aviadon <br /> atrttospheric conditiona similaz to the conditions within the City of Mahtomedi.l'he Administration. <br /> WECS shall be warranted against any system failures reasonable expected in severe B. Solar Equipment and Solar Righfs <br /> weather opetatioa coaditions. <br /> 1. Solar equipment shall be consistent with the setback and height requirements of the <br /> 6. Inapection.The City hecby reserves the right upon issuing any WECS condidonal use principal or accessory building,whichever is applicable.Solaz equipment that is not <br /> perntit to inspect the premises on which the WECS is located.If a WECS is not consistent with the setback and height requirements may be considered pursuant to the <br /> maintained in operational condiNons and poses a potential safety hazard,the owner shall conditional use permit procedures as specified in Subdivision 8.21:Conditional Use <br /> take expedidous action to correct the situation. Pe�i� <br /> 7. Abandontnent.A wind energy conversion system that is out of service for a continuous 2. No person in control of property shall allow a tree or shrub to be placed or grow as to cast <br /> twelve(12)month petiod shall be deemed to 6ave been abandoned.The Zoning a shadow between the hours of 9:00 a.m.and 3:00 p.m.upon a solat collector energy <br /> Administrator or other Authorized Agent may issue a notice of abandonment to the system capabie of generating more than one million(1,000,000)British thermal units <br /> owner of the wind energy facility that is deemed to have been abandoned.The owner (BT'Us)per year,and that supplies a part of energy requirements for improvements on the <br /> shall have the right to respond to the notice of abandonment wiUtin thirty(30)days of proparty where the solar energy system is permanendy located. <br /> notice receipt date.The Zoning Administrator or other Authorized Agent shall withdraw <br /> the notice of abandonment and notify the owner that the notice has been withdrawn if the <br /> owner provided inforn�aaon thaz demonstrates the Wind Energy Conversion System has <br /> notbeen abandoned. <br /> If the wind energy conversion system is determined to be abandoned,the owner of the <br /> WECS shall remove the WECS and retum the property in w6ich tl�WF.CS was]ceated <br /> on to its original condition prior to t6e placement of a WECS,at the owner's sole ezpense <br /> within three(3)months of receipt of notice of abandonment.If tlte owner fails to remove <br /> the WECS,the Zoning Administrator or other Authorized Agent may pursue a legal <br /> acdon to have the wind generator removed at the owners expense. <br /> 8. Temporary Meteorological Equipment Temporazy meuorological equipment located <br /> upon a temporary tower used on an interim basis to gather wind and meteorological data <br /> to determine feasibility of the WECS shall require written approval by the Zoning <br /> Adminishator or other Authorized Agent,and shall comply with the following standards: <br /> a. No more than one(1)such temporary tower shall be permitted on a lot at one time. <br /> b. The tower shall be plued on property for no longer tAan eighteen(18)months from <br /> the date of the Adroinistrative Review issuance.Any abendonal or obsolete <br /> Chapter 11:Planning and Development 99 l00 Chapter 1 I:Planning and Development <br />
The URL can be used to link to this page
Your browser does not support the video tag.