Laserfiche WebLink
at their expense after a demolition permit has been obtained. Removal includes <br /> the entire structure including foundations to below natural grade and transmission <br /> equipment. <br /> (e) Permits. A building permit shall be obtained for any wind energy system prior to <br /> installation. <br /> ffl Residential Use. The power produced from the residential WECS shall only be <br /> used for on-site consumution and at no times sha11 electricity be distributed across <br /> property lines. <br /> Page 4 of 4 <br />