My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02-23-2015 Council Packet
Orono
>
City Council
>
2015
>
02-23-2015 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/29/2021 3:43:13 PM
Creation date
4/2/2015 2:09:27 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
184
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
, MINUTES OF THE <br /> ORONO CITY COUNCIL MEETING <br /> February 9,2015 <br /> 7:00 o'clock p.m. <br /> (7. #15-3714 CREATE SECTION 14-142 WELLHEAD PROTECTION ORDINANCE— <br /> ORDINANCE NO. 135 continuedj <br /> McMillan noted Green Trees was for connection to City sewer and not water. <br /> Levang moved,McMillan seconded,to adopt ORDINANCE N0. 135,an Ordinance for Protecting <br /> the City's Wetlheads by Prohibiting New Private Wells Where Public Water Supply is Available. <br /> VOTE: Ayes 3,Nays 2,Walsh and Printup Opposed. <br /> *8. #15-3715 AMENDMENT TO MUNICIPAL CODE SETION 14-134: SERVICE PIPES— <br /> ORDINANCE NO. 137 <br /> Levang moved,Cornick seconded,to adopt ORDINANCE NO. 137,an Ordinance Amending the <br /> Municipal Code by Revising the Responsibilities for Water Service Repairs. VOTE: Ayes 5, <br /> Nays 0. <br /> 9. STORM WATER AND DRAINAGE TRUNK FEE REVIEW <br /> Gaffron noted the City Council first looked at this issue back in May of 2014 at a work session. In 2002 <br /> the City adopted a surface water management plan that serves as a guide for developing and management <br /> of the surface water system of the City. That surface water plan was updated in January of 2011. <br /> An element of the plan is an inventory of the existing surface water systems,which includes a variety of <br /> stormwater facilities such as storm sewer pipes,drainage ways,ponding areas,etc. In addition,the 2002 <br /> plan identified long-term system improvements that would be needed as the City becomes more fully <br /> developed to deal with stormwater management as it relates to water quality and water quantity. The <br /> 2002 had an estimated cost of nearly$11 million in 1998 dollars. <br /> The update of the surface water plan in 2011 acknowledged that there are difficulties in funding surface <br /> water management needs. The CIP categorizes planned expenditures in four specific areas. It talks about <br /> activities associated with meeting the City's obligations towards its NPDES or National Pollution <br /> Dischazge Elimination System permit,which includes educational materials,cleanup days, inspection <br /> programs for illicit sewer and septic system discharges,etc. <br /> A second element of the plan included capital improvement projects, such as implementation of the plan <br /> itself,water quality and water quantity projects for developing areas, wetland restorations,priority <br /> projects for developed areas,and ongoing operations and maintenance of the storm sewer system. It also <br /> included implementation of official controls,which are City Ordinances. <br /> Gaffron stated the annual planned City expenditures in these four areas total approximately$250,000 to <br /> $350,000 a year. Gaffron indicated there are a small number of funding sources to accomplish these <br /> goals and noted the level of funding needed for planned Capital Improvement projects is not fully covered <br /> by the stormwater utility or permit fees. Gaffron noted the City will likely have some issues with <br /> phosphorus reduction requirements since it is likely the total maximum daily load studies will suggest <br /> there are certain bodies of the water within the City that are going to require projects. <br /> Page 13 of 26 <br />
The URL can be used to link to this page
Your browser does not support the video tag.