My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02-23-2015 Council Packet
Orono
>
City Council
>
2015
>
02-23-2015 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/29/2021 3:43:13 PM
Creation date
4/2/2015 2:09:27 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
184
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
,� . . <br /> RDM MUNICIPAL SUPPLY&SERVICE,InC.2650 East Ryan Road'"Oa&Creek,WI�53154 Phone:414.856.1300'"Fax: 414.856.1342 <br /> www.rdmpumps.com <br /> - Leakage sensor <br /> - Stainless steel I'sftirtg chain <br /> - Handle <br /> - 4"base discharge elbow <br /> - Stainless steel upper bracket <br /> - Stainless steel guide pipe <br /> One (1� "RUM"Nema 3R 304 stainless steel double door controt panel to contrat two 7.5hp,230/3 <br /> heavy duty submersible pumps in a pump down mode per the attacE�ed scope of supply. To <br /> include the rnanual transfer switch, iS00ct Controller,float back-up,alarm light,and alarm <br /> horn per the attached biil of material. We incfude the automatic transfer switch and a manual <br /> transfer switch with generator receptacle. We wil[leave spa�e for mounting the existing <br /> Mission unifi. <br /> Four (4) Connery Float switches with 50'of cabie <br /> One (1) Submersible transducer with 60'of cabfe <br /> 1'wo (2} 4"Val-Matic swing flex check valves <br /> Two �2) 4"J&S non rising gate valves <br /> One (1) Lot of piping to replace the piping inside the station(using stainless steel flange accessory <br /> kits) � <br /> Oee (i) Lot of labor to install the abave equipment <br /> One (i) Cable rack and J hook <br /> One (1) Warranty as speci�ied - . <br /> One (1j Start-up and training as specified <br /> Item #2-Total insta[led Price - $45.fi00.00 (+tax) <br /> ttem#2 Notes: <br /> 1} The above pricing does not inctude the electr�cian's costs. <br /> 2} We include the concrete pad under the control panel in our pricing <br /> 3) New guide rails are to be supplied <br /> 3� <br />
The URL can be used to link to this page
Your browser does not support the video tag.