My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02-23-2015 Council Packet
Orono
>
City Council
>
2015
>
02-23-2015 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/29/2021 3:43:13 PM
Creation date
4/2/2015 2:09:27 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
184
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
� <br /> heavy duty submersible pumps in a pump down mode per the attached scope of supply. <br /> To include the manual transfer switch, 1500ct Controller,float back-up,alarm light,and <br /> alarm horn per the attached bill of material. We include the automatic transfer switch and <br /> a manual transfer switch with generator receptaGe. We will leave space for mounting the <br /> existing Mission unit. <br /> One (1) Provide and install retro-fit access cover and safety grate—3001b rated <br /> Four (4) Float switches with 50'of cable <br /> One (1) Submersible transducer with 60'of cable <br /> Two (2) 4"swing flex check valves <br /> Two (2) 4"non rising gate valves <br /> One (1) Lot of piping to replace the piping inside the station(using stainless steel flange accessory <br /> kits) <br /> One (1) Lot of labor to install the above equipment <br /> One (1) Electrical Install by a licensed master electrician. <br /> One (1) Cable rack and J hook <br /> One (1) WaRanty as specified <br /> One (1) Start-up and training as specified <br /> Item #2 -Total Installed Price - - $43,100.00 (+ tax) <br /> Item#2 Notes: <br /> 1) We include the concrete under the control panel in our pricing <br /> 2) New guide pipe to be supplied <br /> Note: <br /> We do not include the concrete pad under the generator but we do include assisting the city with the <br /> concrete pad. <br /> As discussed,we would propose to build the panels and procure the equipment over the winter <br /> months with a late April or early May install. <br /> Thank you for the opportunity to provide you with a proposal for this equipment. <br /> If you have questions or require more information, please don't hesitate to give me a call. <br /> Sincerely, <br /> pat/�a�a� <br /> Pat Matay <br />
The URL can be used to link to this page
Your browser does not support the video tag.