Laserfiche WebLink
, COU�CIL MtET1NG <br /> t FE� 2 3 2015 <br /> REQUEST FOR COUNCIL ACTION CITY OF ORONO <br /> DATE: February 17, 2015 <br /> ITEM NO.: 7 <br /> Department Approval: Administrator Reviewed: Agenda Section: <br /> Name Scott Oberaigner Public Works Director/ <br /> Title Public Works Supervisor ' City Engineer's Report <br /> Item Description: Approve Rehabilitation of ' Station 8 (2662 West Lafayette Rd) and Lift <br /> Station 15 (1377 Vine Pl) <br /> List of Exhibits <br /> A- Quote from Quality Flow Systems Inc <br /> B- Quote from RDM <br /> C- Quote from EP <br /> l. Purpose. The purpose of this action item is to gain Council approval to accept the quote for <br /> improvements to lift stations 8 and ]5. <br /> 2. Background. Public Works has a maintenance plan for the 461ift/grinder stations that are part of the <br /> sewer system. As part of the plan, each station is inspected annually to identify routine maintenance needs. <br /> In addition to routine maintenance, the plan also includes the upgrade of two lift stations per year. A lift <br /> station upgrade involves replacing discharge piping, pumps, control panel and all electrical that operates <br /> . the lift station. The lift stations that are upgraded are selected based on a number of factors: age, <br /> maintenance records, issues discovered during the annual inspection and the risks associated with the <br /> failure of the lift station. Lift Station 8 (2662 West Lafayette Rd)was reconstructed in 1990 and Lift <br /> Station 15 (1377 Vine Pl)was constructed in 1970 and both lift stations surpassed their life expectancy. <br /> Maintenance costs are increasing due to their age and the outdated technology of the controls and pumps. <br /> 3. Quotes. We solicited three yuotations for Lift Station 8 and Lift Station 15 upgrades; listed below: <br /> Gom an LS�#8�te�ab LS#15�tehab � •�o�al� <br /> Quali Flow $35,450 $43,100 $78,550 <br /> RDM $35,950 $45,600 $81,550 <br /> EP $52,200 $58,100 $110,300 <br /> l. Did not include electrical costs. A separate electrical contract would cost another 5,200. <br /> 4. Funding. These projects are planned for on the CIP and funded from the Sanitary Sewer Fund. <br /> 5. Recommendation. We recommend acceptance of the quote from Quality Flow Systems Inc. Quality <br /> Flow Systems Inc to provide a new control panel,two new pumps, discharge piping and all electrical work <br /> for LS 8 in the amount of$35,450 and $43,100 for Lift Station 15 for a combined total of$78,550.00. <br /> Quality flow systems has done similar work for the city in the past with positive results. <br /> COUNCIL ACTION REQUESTED <br /> Motion to accept the quote in the amount of$78,550.00 from Quality Flow Systems Inc to upgrade LS 8 <br /> and LS 15. <br />