My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02-09-2015 Council Packet
Orono
>
City Council
>
2015
>
02-09-2015 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/29/2021 3:42:57 PM
Creation date
4/2/2015 11:58:35 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
305
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
� , � <br /> Erosion Control Supplemental Inforrnation <br /> Final Stabilization will be provided with {seed, sod, etc): Seed and Sod <br /> and 6 inches of topsoi!will be added/replaced prior to final stabiliza.tion. <br /> Concrete Washout: Location of concrete washout <br /> X Off site _Indicated on site plans _Other(description): _No concrete washout: <br /> Vegetation: Protective fencing will be installed as necessazy so as to exclude all fill and eqaipment <br /> from the drip line or critical root zone,whichever is greater,of all vegetation to be retained. <br /> _Yes X Not Applicable Other(description): <br /> Inspections: An erosion control inspection plan is required for all projects distttrbing'/4 acre or <br /> greater. The inspection requirements are as follows: <br /> 1) The individua!ident�ed as being responsible for implementing the erosion control <br /> � plarr must roulinely inspect the construction site once every seven days during active <br /> construction and within 24 hours after a rainfall evertt greater than 0.S inches in 24 <br /> hours. <br /> 2) All inspectiorts and maintenance conducted during constructiort must be recorded in <br /> writing and these records must be retatned with the erosion conirol plan and made <br /> available at the District's reyuesd within 24 hours. ftecords of each inspection and <br /> maintenance activity sha!!include: <br /> i. Date arrd time of inspections; <br /> ii. Narree of person conducting inspections; <br /> iii. Findings of inspections, including reconrmendations for corrective actions; <br /> iv. Corrective actions taken{including dates, times and party completing <br /> maintenance activities);and <br /> v. Date and amount of all rainfall events greater than O.S inches in 24 hours. <br /> Provide the following information for the primary individual responsible for implementing the erosion <br /> control plan: <br /> Name �'�M��' <br /> Organization t�''����" ��~� , <br /> Phone �t2 �� �1$�� AlternatePhone ��� ���✓ '��'g?CD <br /> Email ����'� t �t�1�C�+�i�+ , t�S <br /> I certTfy that I am familiar with the requirements of the MCWD Erosion Control Rule and that the <br /> proposed activity will be conducted in compliance with this rule. <br /> �M.o�,.�� !2 •ti� t�l-- <br /> Signature of Applicant or Authorized Agent Date <br /> I��GEI�/'Eb <br /> DEC 12 2014 <br /> � � 7 �� �nv nF nRnNn <br />
The URL can be used to link to this page
Your browser does not support the video tag.