Laserfiche WebLink
CITY OF ORONO POLICE DEPARTMENT <br /> Application#OS <br /> PAGE 2 <br /> p B C D E F G G1 H I <br /> WORK WORK TOTAL <br /> COMPLETED COMPLETED MATERIALS COMPLETED <br /> ITEM SCHEDULED PREVIOUS THIS PRESENTLY &STORED BALANCE RETAINAGE <br /> NO. DESCRIPTION OF WORK VALUE APP PERIOD STORED TO DATE % TO FI1�IISH G X 5% <br /> PERMITS,BOND,MOBILIZATION, <br /> START UP 9,345.00 9,345.00 9,345.00 100% 0.00 467.25 <br /> ALLOWANCE 5,000.00 1,822.00 3,178.00 5,000.00 100% 0.00 250.00 <br /> SANTTARY SEWER UNDERGROUND <br /> Material 16,985.00 16,985.00 16,985.00 100% 0.00 849.25 <br /> Labor 10,170.00 10,170.00 " 10,170.00 100% 0.00 508.50 <br /> SATTITARY SEWER ABOVE GROUND <br /> Material 5,475.00 3,475.00 2,000.00 5,475.00 100% 0.00 273.75 <br /> Labor 4,980.00 2,980.00 2,000.00 4,980.00 100% 0.00 249.00 <br /> DOMESTIC WATER <br /> Material 7,814.00 5,814.00 2,000.00 7,814.00 100% 0.00 390.70 <br /> Labor 10,140.00 6,140.00 4,000.00 10,140.00 100% 0.00 507.00 <br /> CONDENSATE WATER <br /> Material 1,402.00 1,402.00 1,402.00 100% 0.00 70.10 <br /> Labor 1,980.00 980.00 1,000.00 1,980.00 100% 0.00 99.00 <br /> GAS PIPING <br /> Material 4,077.00 2,077.00 2,000.00 4,077.00 100% 0.00 203.85 <br /> Labor 6,300.00 2,300.00 4,000.00 6,300.00 100% 0.00 315.00 <br /> FIXTURES <br /> Material 12,771.00 4,771.00 8,000.00 12,771.00 100% 0.00 638.55 <br /> Labor 6,720.00 1,720.00 5,000.00 6,720.00 100% 0.00 336.00 <br /> EQUIPMENT PLUMBING <br /> Material 12,101.00 10,101.00 2,000.00 12,101.00 100% 0.00 605.05 <br /> Labor 2,640.00 640.00 2,000.00 2,640.00 100% 0.00 132.00 <br /> DEMOLITION <br /> Material 14,195.00 14,195.00 14,195.00 100% 0.00 709.75 <br /> L,abor 4,800.00 4,800.00 4,800.00 100% 0.00 240.00 <br /> INSULATION SUB 5,705.00 0.00 0% 5,705.00 0.00 <br /> TEMP CONTROL SUB 15,000.00 14,000.00 1,000.00 15,000.00 100% 0.00 750.00 <br /> 157,600.00 113,717.00 38,178.00 0.00 151,895.00 96% 5,705.00 7,594.75 <br />