Laserfiche WebLink
A B C D E F G H I <br /> WORK COMPLETED MATERIALS TOTAL ' <br /> FROM PRESENTLY COMPLETED BALANCE TO RETAINAGE <br /> ITEM SCHEDULED STORED AND STORED % FINISH (IF VARIABLE <br /> NO. DESCRIPTION OF WORK VALUE P�VIOUS THIS PERIOD OT IN D OR TO DATE �C'-C� (C-G) RATE) <br /> APPLICATION � E� �D+E+F) <br /> (D E) <br /> 0.00 0.00 0.00 0.00 0.00 0.00°/a 0.00 0.00 <br /> 0.00 0.00 0.00 0.00 0.00 0.00% 0.00 0.00 <br /> 0.00 0.00 0.00 0.00 0.00 0.00% 0.00 0.00 <br /> 0.00 0.00 0.00 0.00 0.00 0.00% 0.00 0.00 <br /> 0.00 0.00 0.00 0.00 0.00 0.00% 0.00 0.00 <br /> GRAND TOTAL $315,195.00 ' Y�<<0 � $0.00 $306,605.00 97.27% $8,590.00 $15,334.75 <br /> R <br /> AIA Document G703T""-1992.Copyright�1963,1965,1966,1967,1970,1978,1983 and 1992 byThe American�nstitute of Architects.All rights reserved.WARNING:This AIA� Document is protected by 2 <br /> U.S.Copyright Law and International Treaties.Unauthorized reproduction or distribution of this AIA'� Document,or any portion of it,may result in severe civil and criminal penaities,and will be <br /> prosecuted to the maximum extent possibie under the law.This document was produced by AIA software at 12:48�32 on 12123/2014 under Order No.1276189683_1 which expires on 09/26/2015,and is not for <br /> resale. (1630695796) <br /> User Notes: <br />