My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01-26-2015 Council Packet
Orono
>
City Council
>
2015
>
01-26-2015 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/29/2021 3:42:36 PM
Creation date
4/2/2015 11:07:58 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
120
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
� <br /> . � <br /> COUNCIL MEETING <br /> JAN 2 6 2015 <br /> REQUEST FOR COUNCIL ACTION CITY OF ORONO <br /> DATE: January 26, 2015 <br /> ITEM NO: �' <br /> Department Approval: i� Administrator Reviewed: Agenda Section: <br /> Name Adam T. Edwards Public Works Director/ <br /> Title Public Works Director City Engineer's Report <br /> Item Description: 2014 Sanitary Sewer Rehabilitation Project Change Order#1 <br /> List of Exhibits <br /> A- Change Order Request No.l <br /> 1. Purpose. The purpose of this request is to gain council approval for Change order#] which will <br /> provide improved Infiltration and Inflow(I&I) protection of especially vulnerable manholes. <br /> 2. Background. On June 9, 2014 Council approved the 2014 Sanitary Sewer Rehabilitation Plan <br /> with an estimated cost of$250,000. The 2014 Sanitary Sewer Rehabilitation Project consists of <br /> Cured In Place Pipe (CIPP) lining approximately 4,000 feet of sanitary sewer pipes, manhole <br /> reconstruction, and lid replacement. These sewer lines are located in low lying areas where the pipe <br /> is below the groundwater elevation. These lines have significant I&I issues and the City will further <br /> reduce the amount of clean water entering the system which is treated by MCES. On August 1 l, <br /> 2014 Council awarded the contract to Insituform Technologies in the amount of$230,921.50. <br /> 3. Issue. The high water and heavy rains of the summer pointed to additional vulnerabilities in <br /> select manholes. Several manholes need to be raised and three were identified as being located in <br /> soils with excessively high hydrogen sulfide levels. (See Exhibit A) The contractor is currently <br /> installing the Cured in Place Pipe (CIPP)portion of the contract and is scheduled to complete the <br /> manhole portions no later than June 2015. <br /> 4. Funding. The budgeted amount for this project was $250,000. The contract award amount was <br /> $230,921. The Change Order will add $12,268 to the contract. The total contract amount with the <br /> change order will be $243,189. This project is funded with existing funds in the Sanitary Sewer <br /> Enterprise Fund. The additional amount will be included in our MCES surcharge offset. <br /> 5. Recommendation. It is my recommendation that the City council approve the change. <br /> COUNCIL ACTION REQUESTED: <br /> Consider a motion to accept change order#1 for the 2014 Sanitary Sewer Rehabilitation. <br />
The URL can be used to link to this page
Your browser does not support the video tag.