Laserfiche WebLink
CONTINUATION SHEET AIA DOCUMENT G703 PAGE 2 OF 2 <br /> AIA DOCUMENT G702,APPLICATION AND CERTIFICATE FOR PAYMENT,CONTAINING APPLICATION NUMBER: 2 <br /> CONTRACTOR'S SIGNED CERTIFICATION IS ATTACHED. APPLICATION DATE: 11/20/2014 <br /> IN TABULATIONS BELOW,ANOUNTS ARE STATED TO THE NEAREST DOLLAR. PERIOD TO: 11/30l2014 <br /> USE COLUMN 1 ON CONTRACTS WHERE VARIABLE RETAINAGE FOR LINE ITEMS MAY APPLY. ARCH.PROJ.NUMBER: <br /> q g C D E F G H I J <br /> WORK COMPLETED MATERIALS TOTAL <br /> FROM THIS PRESENTLY COMPLETED BALANCE <br /> PREVIOUS PERIOD STORED AND STORED °� TO <br /> SCHEDULED APPLICATION (NOT IN TO DATE (G/C) FINISH RETAINAGE <br /> ITEM NO. DESCRIPTION OF WORK VALUE D+E D OR E D+E+F C-G 5.00% <br /> 1 Work Scope 96 Tiling <br /> Section#09 30 00 Titing <br /> Pertortnance 8 Pavment Bonds 1,202.00 1,202.00 1,202.00 100°� 0.00 60.10 <br /> Base Bid <br /> Labor 12,825.00 5,130.00 7,695.00 12.825.00 100°k 0.00 64125 <br /> Materials 13,529.00 13,529.00 13,529.00 100°k 0.00 676.45 <br /> Atlowance for unforseen Conditions <br /> (aRiGe 1.04 from woiic scope summaries) 1,000.00 1,000.00 1,000.00 100°k 0.00 50.00 <br /> Aitemate#1 <br /> Labor 2,175.00 0.00 2,175.00 2,175.00 100°� 0.00 108.75 <br /> Materials 2,650.00 2,650.00 2,650.00 100°� 0.00 132.50 <br /> Alternate#Z <br /> Labor 3,338.00 3,338.00 3,338.00 100°� 0.00 166.90 <br /> Materials 3,356.00 3,356.00 3,356.00 100°k 0.00 167.80 <br /> Cp#� 625.00 625.00 625.00 100°k 0.00 31.25 <br /> Pa e 2 Totals 40,700.00 26,492.00 14,208.00 0.00 40,700.00 100% 0.00 2,035.00 <br />