Laserfiche WebLink
CONTINUATION SHEET AIA DOCUMENT G703 PAGE 2 OF 2 <br /> AIA DOCUMENT G702,APPLICATION AND CERTIFICATE FOR PAYMENT,CONTAINING APPLICATION NUMBER: 2 <br /> CONTRACTOR'S SIGNED CERTIFICATION IS ATTACHED. APPLICATION DATE: 11/20/2014 <br /> IN TABULATIONS BELOW,ANOUNTS ARE STATED TO THE NEAREST DOLLAR. PERIOD TO: 11/30/2014 <br /> USE COLUMN 1 ON'CONTRACTS WHERE VARIABLE RETAINAGE FOR LINE ITEMS MAY APPLY. ARCH.PROJ.NUMBER: <br /> A B C D E F G H i J <br /> WORK COMPLETED MATERIALS TOTAL <br /> FROM THIS PRESENTLY COMPLETED BALANCE <br /> PREVIOUS PERIOD STORED AND STORED % TO <br /> SCHEDULED APPLICATION (NOT IN TO DATE (G/C) FINISH RETAINAGE <br /> ITEM NO. DESCRIPTION OF WORK VALUE D+E D OR E D+E+F C-G 5.00% <br /> 1 Work Scope 96 Tiling <br /> Section#09 30 00 Tiling <br /> Perfortnance 8�Pavment Bonds 1,202.00 1,202.00 1,202.00 100°� 0.00 60.10 <br /> Base Bid "� <br /> Labor 12,825.00 �30 �� 40'/ � �'�•� <br /> Materiais 13,529.00 13,529.00 13,529.00 100% 0.00 676.45 <br /> Allowance for unforseen Conditions <br /> (article 1.04 from work scope summaries) 1,000.00 0.00 0°� 1,000.00 0.00 <br /> Alternate#1 uv <br /> Labor 2,175.00 -� I -f7 O�l a`�Z 7� � <br /> Materials 2,650.00 2,650.00 2,650.00 100% 0.00 132.50 <br /> Alternate#2 <br /> Labor 3,338.00 0.00 0°k 3,338.00 0.00 <br /> Materials 3,356.00 3,356.00 3,356.00 100% 0.00 167.80 <br /> CO#1 625.00 625.00 625.00 100% 0.00 31.25 <br /> Pa e 2 Totals 40,700.00 1,202.00 '� . l� 0.00 , Z� .205� � a�� (� <br /> Changes per Project Manager: <br /> Jason Rentmeester <br /> , <br />