<br /> ==- -� - Document G703 — 1992 Instructions
<br /> �
<br /> Continuation Sheet
<br /> GENERAL INFORMATION
<br /> Purpase and Related Documents.AIA Document G702,flpplication and Certificate for Payment,is to be used in conjunction with AIA Document G703,
<br /> Conflnuadon Sheet.These documenls are designed for use on Projecks where the Conhactor has a direct Agreement with the Owner.Procedures for their use are
<br /> covered in A(A Document A201,General Conditions of the Contract for Construction.
<br /> Use of Current Documents.Prior to using any AIA Contract Document,users shouid consult www.aia.org or a local AIA component to verify the most recent
<br /> ed'�ion.
<br /> Reproductions.This document is a eopyrighted work and may not be reproduced or excerpted from without the express�vritten permission of the AIA.There is
<br /> no imp��ed permission to reproduce ihis document,nar does membership in The American tnstitute of Architects confer any further rights lo reproduce this
<br /> documenf.The AIA hereby granfs the purchaser a limited license to reproduce a rnaximum of ten copies of a corr�leted G703,but only ior use in connection wiih
<br /> a paficvlar project The A{A wi71 not permit reproduction outside of the limited license For reproduction granted above,except upon written request and receipt oE
<br /> written petmission from the AIA.Righks to reproduce the document may v�y(or users of AIA software.Licensed AIA soflware users shoutd consult the End User
<br /> iicense Agreement(ECM�.To report copyright vrolations of AIA Conlract Documents,e-mail 7he American Ins6tute of Architects'legal counsel,
<br /> copyrigfif@aia.org.
<br /> COMPLETINGTHEG703 F�RM
<br /> Heading:This infocmation shoutd be completed in a manner consistent with similar information on AIA Document G702,Application and Certificate for Payment.
<br /> Columns A,9&C:These columns should be�mpleted by idenlifying lhe various portions of t�e Project and their scheduled values consistent with the schedule
<br /> of values submitted to the Architect at the commencement of Ihe Project or as subsequently adjusted.The breakdown may be by sections of the Work or by
<br /> Subcontracfors and should remain consistenf throughout the Project.Multiple pages should be used when required.
<br /> Column C should be subtotaled at lhe bottom when more ihan one page is used and totaled on the Iast page.lnitially,this total should equaf the original Contract
<br /> Sum.Tha total of column C may be adjusted by Change Orders during ihe Project.
<br /> Column D:Enter in ihis cotumn the amount oi completed Work covered by ihe previous application(columns D&E from ihe previous applicaiion).Values from
<br /> column F(Materials Presently Stored)from the previous application should not be enlered in this column.
<br /> Column E:Enfer here ihe value oF Work completed al ihe iime of this application,including the value�i materials incorporaled in the project that were listed on
<br /> the previous application under Materials Presently Stored(column F).
<br /> Column F:Enter here the value of Materials Presently Siored for which payment is sought.The total o(the column must be recalculated at the end of each pay
<br /> pedod.This value covers both materials newly slored for which payment is sought and materials previously stored which are not yet incorporated into the Project.
<br /> Mere paymecit by the Owner for stored materials does not result in a deduction from this column.Only as materials are incorporated into the Project is their value
<br /> deducted from this column and incorporated into column E(Work Completed—This Period.)
<br /> Column G:Enter here ihe totat of co�umns D,E and F.Calculate the percentage completed by dividing column G by coiumn C.
<br /> Column H:Enter here the differe�ce between column C(Scheduled Vslue)and column G(Total Compleied and Stored to Date).
<br /> Column I:This rmlumn is normally used only for contracts+rrhere variable retainage is permitted Qn a line-item basis.It need not be completed on projects where a
<br /> conshant retainage is wiihheld from the overall contract amount.
<br /> Change Orders:Atthough Change Orders could ba incorporated by changing the schedule of va�es each time a Change Order is added to the Project,this is not
<br /> normally done.Usually,Change Orders are listed separately,either on their own G703(orm or at the end of the basic schedule.The amount of the original
<br /> contract adjusted by Change Orders is to be er�tered in the appropriate location on the G702 form.
<br /> Construction Change Direcfives:Amounts not in dispute thaf have been inctuded in Construction Change Directives should be incorporated into one or mare
<br /> Change Orders.Amounts remaining in dispute should be dealt with according to Sec6on 7.3 in A201.
<br /> The fof/owuig is ar+example of a Continuatian Sheet for work in progress.Please note that dollar amounts shown below are for!llusba6ve pwposes onty,and are not intended to
<br /> reflect 8ctual oonsfiucffon_cosfs.
<br /> A 8 C U E F G H 1
<br /> � , � A1.�7ERI.V� 701"AI
<br /> BdCANCE
<br /> ITF1f PRFJGYRY CO�IPLtTED ,. RF.I'A1NAGf.
<br /> DL'iCRIPTIU�Ot 5v SCHEDI1l,FA IRU�t PR�VIUUS TO
<br /> NO. O� VAL('F. APPLICA71OV 7HISPL'ItIUU S�(Ltm A�USfURkD �G-C� FIVLSH �If\'ARIAHif
<br /> �D.CI fM7flv TOU.\7F rC-tll R'\T}I
<br /> �URti iD+ti+F�
<br /> ! MOBILIZATION 5,000 5,000 0 0 5,000 100 0
<br /> 2 SNMPREMOVAL 5,000 5,000 0 0 5,000 100 0
<br /> � EARTH WORK l5,000 10,000 5.000 0 15,OG0 100 0
<br /> � LOWERRETAINTN6WAlL 30,000 0 5.000 0 5,000 50 5,OQ0 .
<br /> 5 CURB$6 MISG CONC. 5,000 0 O 0 0 0 5p00
<br /> 6 PAVINfi.UPPER DRIVE 20.000 0 0 0 0 0 20.000
<br /> 7 PAVIN6,IOWER DRIVE 20,000 0 0 0 0 0 20,000
<br /> 8 PpVfRS 20,000 0 0 10,000 10,060 50 IO.00D
<br /> 9 BRILK WORK 5.000 0 0 0 0 0 5.OW �
<br /> 30
<br /> 11 t05.00Q 20.000 50.000 ]0.000 40.000 63.000
<br /> AIA Document G703TM—7992.Copyriqht�1863,19fi5,1366,1367,1970,1978,1983 and 1992 by The American Inslitule et Architects.All rights reserved.WARNING:
<br /> This AIA�Document is protected by U.S.Capyright Law and International Trealies.Unauthorized reproduction or distribution ot this AIA�pocumenl,or any
<br /> portion ot it,may result in severe civil and criminal penalties,and wiil be prosecuted to ihe maximum extent possibTe under the law.Purchasers ere permitted to
<br /> reproduce ten(10)copies of tli�s document when completed.To repor!copyright violations of AIA Contract Documents,e-mail The American lnstifute of ArChitacts'legal
<br /> counsel,copyrighta�aia.org.