Laserfiche WebLink
_ � <br /> � TM _ ' <br /> ==�� Document G732 2009 Instructions <br /> Application and Cerfificafe for Payment, Construcfion Manager as Adviser Edifion <br /> GENERAL INFORMATION <br /> Purpose.A[A Document G732TM-2Q09,Application and Certificate for Payment,Construction Manager as Adviser Edition,is to be <br /> used in conjunction with AIA Docnment G703''"�-1992,Continuation Sheet.These documents are designed to be used on a Project <br /> where a Constniction Manager is employed as an ndviser to the Owner,but not as a constructor.Procedures for their use are covered <br /> in AIA Doctunent A232T"�-2009,Genetal CondiUons of the Contract for Construction,Consiruction Mana�er as Adviser Edition. <br /> Related Docnments.AIA Document G703-1992. <br /> Use of Carrent Documents.Prior to using any AIA Contract Docwnent,users should consult k�vw.aia.org or a local AIA component <br /> to verify the most recent edition. <br /> Reprodue[ions_This document is a copyrighted tvork and may not be reproduced or excerpted from without the express written <br /> permission of the AIA.There is no impIied pem2ission to reproduce this document,nor does membership in The American Iastitute of <br /> A�hitects confer any fiutherrights to reproduce tl�is document.The AIA hereby grants the purchaser a limited license to reproduce A <br /> maximum of t�n copies of a compieted G732 2009,bui only for use in connection with a particular project.'I'he AIA will not permit <br /> reproduction outside of the limited Iicense for reproduction granted above,except upon written request and receipt of wrilten <br /> pennission from the AIA.Rights to reproduce the document may vary for users of AIA software.Licensed AIA softwarz users should <br /> consult the End LJser License Agreement(EULA).To report copyrigbt��iolations of AIA Contract Documents,e-mail The American <br /> Institute of Architects'legal counsei,copyright@aia.org. <br /> USING G732-2009 <br /> After the Contractor has mmpleted AtA Document G703,Continuation Sheet,summary information should be transfe�red to AIA <br /> Document G732 2009,Application and Certificate for Payment,Construction Manager as Adviser Edition.The Contractor should <br /> sign G732,have it notarized and submit it,togett�er with G703,to tbe Construction Manager and Architect.The Construcfion ManAger <br /> and Anhitect should review G732 and G703 and,if they are acceptable,complete the Certificate for Payment on G732.The <br /> Construc6on Manager and Architect may certif}a different amount than that applied for pursuant to Sections 9.5 and 9.6 of <br /> A232�2009.They should then initia]all figures on G732 and G703 that have been changed to conform to the amount certified and <br /> attach an explanation.The completed G732 and G703 should be forwarded to the Owner. <br /> COMPLETING G703 <br /> Aeading.This information should be completed to be consistent�vith similtu information on AIA Document G732-2009,Application <br /> and Certificate for Payment,Construction Manager as Adviser Edition. <br /> Colmm�s A,B and C.These coimm�s shou(d be completed by identifying the various portions of the Project and their scheduled <br /> value consistent with the schedule of valnes submitted at the commencement of the Project or as subsequently adjusted.The <br /> breakdown ma)be by sections of the Work or by Subcontractors and should remain consistent throughout the Project.Multiple pages <br /> shonld be used when ret{uired. <br /> Colamn C.Shauld be subtotaled at the bottarn�vhen more than one page is used and totaled on the last page.Initially,this total <br /> sUouid equal the original Contract Sum.T'he total of column C may be adjusted by Change Orders during the Project. <br /> Coimm�D Enter in this column the amount of completed work covered by the previous application(columns D&.E from the previous <br /> applica6on}.Values from colomn F(Materials Presently Stored)from the previous application should not be entered in this column. <br /> Column E.Enter here the value of Work completed at the time of tius application,including the value of materials incorporated into <br /> We project tivhich were listed on the previous application under Materials Presently Stored(column F). <br /> Cotuma F.Enter here the vatue of Materials Presently Stored for which payment is soughL The total of the colwnn must be <br /> recalculated at the end of each pay geriod.This vahie covers both materials newly stored for which payment is sought and materials <br /> previously stored which are not yet incorporated into the Project.Mere payment by the Owner for stored materials does not result in a <br /> deducrion from fhis column.Only as materials are incorporated into the Project is their value deducted from this column and <br /> incorporated imo column E(Work Completed-Ttiis Period). <br /> Column G.Enter here the tota!of columns D,E tuid F.Calculate the pementage completed by dividing column G by column C. <br /> Columtt H.Esiter here the difference between column C(Scheduled Value)and column G(Total Completed and Stored to Date). <br /> Column I.This column is nom�ally used only for contracts where variable retainage is pemutted on a line-item basis.It need not be <br /> completed on projects where a constant retainpge is withheid from the overall contract amount. <br /> Change Orders and Construction Change Directives.The amount of the original contract,adjnsted by Change Orders and amounts <br /> a�thorized for Construction Change Directives as reflected in line 2,is to be entered on tine 3 of the G732 form. <br /> MAKiNG PAYMENT <br /> The Owner should make payment dicectly to the Contractor based on the amount certif ed by the Constructeon Manager and Architect on <br /> AIA Document G732-2009,Application and Certiftcate for Payment,Construction Manager as Adviser Edition.The completed form <br /> contains the name and address of the Cor►tractor.Paymznt shouid not be made to any other party unless speeifically indicated on G732. <br /> A1A Document G732TM-2009(fortnerly G702TMCMa-1992).Gapyright A 1392 atid 2009 by The American tnstilute of Arohttects.Ali rights reserved. <br /> WARN(NG:This AIA�'Document is protected by U.S.Copyrtghf l.aw and Intemationai Treaties.Urtaathorized reproducfion or�stribu6an of this <br /> AIA°Document,or any portion of it,may result in severe civil and criminai peqafties,and wiil 6e prosecuted to the maximum extent possible <br /> under the law.Purchasers are permitted to reproduce ten(10)copies of this daximent when compteted.To reporl copyrighE viofaHons of AIA Contract <br /> Documenis,e-mail The American InsUtute oPArchiiects'legat counsel,copyright@aia.org. <br />