My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01-15-2015 Council Packet
Orono
>
City Council
>
2015
>
01-15-2015 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/29/2021 3:42:14 PM
Creation date
4/2/2015 10:36:50 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
231
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
� NOV 2 4 2014 <br /> ��� <br /> :.'�3,M�'... TM � � }(RpUS-ANDERSON� <br /> �•�: Document G732 009 <br /> CIRCLE PiNES <br /> Application and Certificate for Payment, Construction Manager as Adviser Edition <br /> TO OWNER: PROJECT: APPLICATi01V N0: DISTR�BUTION T0: <br /> City of Orono Orono Police Dpt. 04 Four OWNER <br /> 2730 Kelley Parkway PERIOD T0: CONSTRUCTIOP�MANAGER <br /> FROM VIA CONSTRUCTION Orono, MN 55356 CONTRACT DATE: 11/30/2014 ARCHITECT <br /> CONTRACTORkellington Construction, Inc. MANAGER: Kraus Anderson PROJECT NOS: / / CONTRACTOR <br /> FIELD <br /> CONTRACT FO�b1 North 2nd Street VIA ARCHITECT: OTHER <br /> inneanohs MN 55411 SKD Architects <br /> � The undersigned Contractor certifies that to the best of the Contractor's knowledge,information and <br /> CONTRACTOR S APPLICATION FOR PAYMENT belief the Work covered by this Application for Payment has been completed in accordance with the <br /> Application is made for payment,as shown below,in connection with the Contract. Contract Documents,that all amounts have been paid by the Contractor for Work for which previous <br /> AIA Document G703T"',Continuation Sheet,is attached. Certificates for Payment were issued and payments received from'the Owner,and that current payment <br /> 1.ORIGINAL CONTRACT SUM............................................................$ 198,250.00 shown herein is now due. <br /> 2.NET CHANGES IN THE WORK..........................................................$ -803.00 CONT R• Kelli gton Construction, Inc. <br /> 3.CONTRACT SUM TO DATE(Line 1 t 2) ............................................. $ 197,447.00 By: -5��� `�f��~ DaCe: 11/21/2014 <br /> 4.TOTAL COMPLETED AND STORED TO DATE(Cplumn G on G703)..............�,T�� — State of: Minnesota <br /> 5.RETAINAGE: County of: Hennepin <br /> a. 5 %of Completed Work �►,` Subscribed and sworn to b JESSICA L.PL01fifMA'�) <br /> (Colzrmn D+E on G703J $ 3��1 • �.J me this 2 day o ember, 20 Motery Public <br /> b. 5 %of Stored Material Notary Public: Minnesota <br /> (Column F on G703) $ 0.00 My Commission expires: ����o�s �p�� ���� 31,2019 <br /> .r <br /> Total Retainage(Lines Sa+Sb,or Total in Column I on G703)...................$ �� � � :ERTIFICATE FOR PAYMENT <br /> 6.TOTAL EARNED LESS RETAINA <br /> GE:.........:........................................�v,13f�,� n accordance with the Contract Documents,based on evaluations of the Work and the data comprising <br /> 7.LESS PREVIOUS CERTIFICATES — this application,the Construction Manager and Architect certify to the Owner that to the best of their <br /> (Line 4 minus Line 5 Total) <br /> FOR PAYMENT.......... .�r....�....................� „��}1� 1c�+owledge,information and belief the Work has progressed as indicated,the quality of the Work is in <br /> (Line 6 from prior Certificate) accordance with the Contract Documents,and the Contractor is entitled to payment of the AMOLTNT <br /> S.CURRENT PAYMENT DUE............................................ .......$ IFIED. � <br /> ........ �2�3 7 � <br /> 9.BALAMCE TO FINISH,INCLUDING RETAINAGE . AMOUNT CERTIFIED.......................................................$ �'(� � g'�j�� <br /> r/ (Attnch explanation ifamoatnt certified d�ers from the amozrnt applied.lnitaal all figztres on this <br /> (Line 3 minz�s Line 6) $ �21� 3�b� � Applicntion and oh the Continuation Sheet that are changed to conform with the amount certified.) <br /> CONST AG : <br /> Date: �Q,�„�� <br /> SUMMARY OF CHANGES IN THE WORK ADDITIONS DEDUCTIONS A :I u � e Prrme ConlraGtors are responsib e for performing portions of the <br /> Total changes ap roved in previaus months b Owner $ 0.47 $ -803.47 Pr ' c I t' ation is nol reqt.rtred.) <br /> Total approved this month,inciuding Construction By: '` � Date: � <br /> Chan e Directives $ 1,442.10 $ -1,442.10 This Certi6cate is not negotiabie.The AMOLTNT CERTIFIED is paya e o ly to the ontractor named <br /> TOTALS $ $ _ herein.Issuance,payment and acceptance of payment are without prejudice to any rights of the Owner <br /> NET CI3ANGES IN THE WORI� $ _ or Contractor under this Contract. <br /> CAUTION;You should sign an original AIA Contract Document,on which this text appears in R[D.An original assures that changes will not he obscured. <br /> AIA Document G732'*"-2009�formerly G702T"'CMa-1992).Copyright�1992 and 2009 by The Amencan Institute of Architects All rights reserved.WARNING:This AIA"Document is protected by U.S.Copyright Law and <br /> Internatfonal Treaties.Unauthorired reproduction or distribution of this AIA' Document,or any portion of it,may result in severe Civil and criminal penalties,and will be prosecuted to the maximum extent possibfe under <br /> the law.Purchasers are permitted to reproduce ten(10)copies of this document when completed To report copyright violations of AIA Contract Documents,e-mail The American Institute of Architects'legal counsel,copyright@aia.org. <br />
The URL can be used to link to this page
Your browser does not support the video tag.