My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01-15-2015 Council Packet
Orono
>
City Council
>
2015
>
01-15-2015 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/29/2021 3:42:14 PM
Creation date
4/2/2015 10:36:50 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
231
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
SECTION III - COMPENSATION <br /> A. SCHEDULE OF FEES <br /> 1. T"he CITY agrees to compensate the CONSULTANT at the rate of$50.00 per hour <br /> for the first 20 hours of general engineering service performed each man#h by the <br /> designated Consulting City Engineer. <br /> 2. The CITY agrees to compensate the CONSULTANT at the rate of$60.00 per hour , <br /> for the first 10 hours af general engineexing service performed each month by the <br /> designated Assistant City Engineer. <br /> 3. Compensation ta the CONSULTl1NT shall be at the rate shown below in#he <br /> approved Schedule of Fees for each houx in addition to 20 hours per month <br /> performed by the designated Consulting City Engineer for engineering services. <br /> 4. Compensatioii to the CONSULTANT shall be at the rate shown below in the <br /> approved Schedule of Fees f�r each hour in addition to 10 hours per manth <br /> performed by the designated Assistant City Engineer for general engineering <br /> services. <br /> 5. �ompensation to the CONSULTANT for engineexing services performed by staff <br /> members of ths CONSUL.TANT shall be at the follavv�ing rates; <br /> David Marlini, F.E,, Consultant City Engineer.......................................$125/hr <br /> Sheila Krahse, P.E., Assistant City Engine�r............................................$97/hr <br /> Bradley DeWolf, P,E., Principal-Tn-Charge............................................$135/hr <br /> Sr. Pxoject Manager- Sr, Principal Engineer/Surveyor...................$120-1 SO/hr <br /> Sr. Project Man.ager-Principal Engineer/Surveyor.............................$100-I50 <br /> Project Manager...................................................................................$�00-1�5 <br /> Senior Planner.................................................................................... $100-$154 <br /> Praject/Design Engineer/Planner...........................................................$b0-135 <br /> LicensedSurveyor.................................................................................. $70-I35 <br /> ProjectSurveyor.....................................................................................$60-100 <br /> Speciaiist (Nat, Resources, GTS; Traffic; Other)....................................$70-120 <br /> Senior Technician (Inc, Survey).............................................................$70-120 <br /> Technician(Inc. Survey)..........................................................................$SO-9Q <br /> Administrative Support & Clerical.................................. .......................$35-80 <br /> GPS/Robotic Survey Equipment..................................................NO CHARG� <br /> GIS/Mapping/Cartegraph Transition and Traini.ng..................NO CHARGE <br /> CAD/Computer Usage.................................................................NQ CHARGE <br /> Rautine Offce Supplies...............................................................NO CHARGE <br /> Routine Photo Copying Productions............................................NO CHARGE <br /> Field Supplies/Survey Stakes & Bquipment................................NO CHARGE <br /> Regularly Scheduled Council and Staff Meetings .......................NO CHARGE <br /> Capital Improvement Planning ....................................................NO CHARGE <br /> Mileage.........................................................................................NO CHARGE <br /> 157486�2 <br /> Page 3 of 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.