My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01-15-2015 Council Packet
Orono
>
City Council
>
2015
>
01-15-2015 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/29/2021 3:42:14 PM
Creation date
4/2/2015 10:36:50 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
231
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
• �X����� .�S <br /> ' • = BOt_TON 8� M � N K , I NC� <br /> . Consulting Engineers & Surveyors <br /> " 12224 Nicollet Avenue•Burnsville, MN 55337 <br /> Phone(952)890-0509• Fax(952)890-8065 <br /> www.bolton-menk.com <br /> January 5, 2015 <br /> Mr. Adam Edwards,P.E. <br /> Director of Public Works/City Engineer <br /> City of Orono <br /> 2750 Kelley Parkway <br /> Orono, MN 55356-9387 <br /> RE: Water System Improvements, Construction Phase Services <br /> Dear Adam: <br /> As requested, we have prepared a fee estimate for construction phase services for the North Well House <br /> and Navarre Treatment Facility Improvements. Based on our understanding of the project, we proposed <br /> the following scope of services: <br /> � Prepare and distribute construction contracts <br /> • Organize and conduct preconstruction meeting with contractor and City Staff <br /> • Review all shop drawing submittals from contractor <br /> • Provide critical point construction observation <br /> � Review and make recommendation for contractor payment applications <br /> • Prepare and administer contract modifications as necessary <br /> • Prepare and distribute contractor punch lists <br /> • Prepare record drawings <br /> Based on the scope of services described above, we propose a not-to-exceed fee of$40,800 to be billed on <br /> an hourly basis. <br /> Please let me know if you have questions or need additional information. <br /> Sincerely, <br /> BOLTON&MENK, INC. <br /> �� � �� <br /> David P. Martini,P.E. <br /> Principal Engineer <br /> Cc: Seth Peterson,P.E., Bolton&Menk, Inc. <br /> H;\ORNO\C13108617U_Corres\C_To Others\Water Improvements Construction Fee 1-5-15.doc <br /> DESlGNlNG FOR A BETTER TOMORROW <br /> Bolton &Menk is an equal opportunity employer <br />
The URL can be used to link to this page
Your browser does not support the video tag.