My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01-15-2015 Council Packet
Orono
>
City Council
>
2015
>
01-15-2015 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/29/2021 3:42:14 PM
Creation date
4/2/2015 10:36:50 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
231
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
. Bid Evaluation <br /> �.� �� December 23,2014 <br /> Page 2 <br /> �� <br /> proposed work in Orono. Bolton&Menk, Inc. has worked with Municipal Builders, Inc. on previous <br /> projects that are similar in nature and those projects have been successful. Attached is a letter from <br /> Municipal Builders, Inc. as well as a list of project references. Based on their experience and <br /> qualifications, along with their acceptable bid price, we recommend that the City of Orono consider <br /> awarding the project to Municipal Builders, Inc. <br /> Respectfully submitted, <br /> BOLTON & MENK, 1NC. <br /> —� <br /> ���� � <br /> Seth A. Peterson, P.E. <br /> Principal Engineer <br /> Cc: Dave Martini, P.E.,Bolton&Menk, Inc. <br /> Attachments <br /> H:\ORNO\C13108617U Corres\C To Others\bid eval docx <br />
The URL can be used to link to this page
Your browser does not support the video tag.