Laserfiche WebLink
� COUNCIL MEETINC <br /> � <br /> JAN 12 2015 <br /> REQUEST FOR COUNCIL ACTION <br /> �►n'OF ORONO <br /> DATE: January 12, 2015 � <br /> ITEM NO: ,� <br /> Department Approvaly•�' Administrator Reviewed: Agenda Section: <br /> Name Adam Edwazds /�F-� Public Works Director/ <br /> Title Public Works Directar/City Engineer City Engineer's Report <br /> Item Description: Water Treatment System Ixnpro ents <br /> List of Exhibits <br /> A- Bolton&Menk, Inc.Bid Evaluation Letter <br /> B- Bolton&Menk, Inc. Constnzction Oversight Proposal <br /> 1. Purpose. The purpose of this action item is to gain council approval for award of the Water Treatment <br /> System Improvements. <br /> 2. Background. On May 13, 2013,the Council authorized Bolton and Menk to perform a comprehensive <br /> review and plan for our municipal water system. Bolton Menk provided the review and a plan in <br /> February 2014. Part of the plan recommended upgrades and improvements to the City's drinking water <br /> treatment facilities. Work includes updating the chemical feed system to meet MN Department of Health <br /> requirements as well as replacing roofmg, replacing doors,paining,new electrical and HVAC <br /> improvements,On December 18"', 2014 the city received and opened bids for the Treatment System <br /> Improvements. Four bids were received. The low bid was from Municipal Builders, Inc. of Andover, <br /> MN. <br /> 3. Cost. The low bid is for$625,000. The initial Engineer's estimate was $450,000. The significant <br /> difference between the estixnate and the low bid area are the result of an increased scope of work and <br /> increased construction costs in the industry since the estimate was first prepared a year ago. The <br /> increased scope of work includes improved chemical metering equipment, submersible well transducers <br /> (see Exhibit A for details) In addition to the Construction cost,Bolton and Menk provided an estimate for <br /> construction oversight of not to exceed 40,800. This is below the normal engineering oversight costs of <br /> 20%of construction(see Exhibit B) <br /> Who Work Cost Status <br /> Bolton&Menk,Inc Desi and Bid En ineering $42,160 A roved April, 28 2014 <br /> Munici al Builders, Inc Water Treatment Ixn rovements $625,000 Pendin Award <br /> Bolton&Menk,Inc Construction Oversi ht $40,800 Pending Approval <br /> TOTAL $707,960 <br /> 4. Funding. The project will be funded using the bond that was issued in June 2014. The bond amount <br /> is $1,275,002. $389,500 has been spent on the North Water Tower Rehabilitation and Painting Project. <br /> The remaining Bond funds are planned to be used to partially fund the construction of a 2°a North System <br /> Well which is estimated at$350,000. The remaining funding for the well will come from the water fund. <br /> 5. Timing. Construction will begin upon award of the contract with completion expected by end of <br /> Spring 2015. <br /> COUNCIL ACTION REQUESTED: <br /> Move to award the contract to Municipal Builders, Inc in the amount of$650,000 and approve the <br /> construction phase services to Bolton and Menk in the not-to-exceed amount of$40,800. <br />