Laserfiche WebLink
Document management portal powered by Laserfiche WebLink 9 © 1998-2015 Laserfiche. All rights reserved.
CITY OF ORO�'O SEPTIC SYS'I'E1�S PER.i��IIT APPLICATTON <br /> Box 66 (2750 Kelley Parkway) <br /> Crystal Bay, NS�t 55323 <br /> , , ,,C <br /> JOB SIT'E ADDRESS: ��� �� � ,�`G�C-- �' <� <br /> Occupa.nc�- Type: Residential v Commercial Other <br /> . --—�-�� <br /> Permit Type: i�'ew or Replacement Sy�stem, $100.00 <br /> Repair E�cisting System, $ � . 0 <br /> (Tanks or Drainfield) <br /> 0.50 State surcharge added to above fees <br /> , �`See fee schedule for non-residential permit fees <br /> Otivner's �`ame: �r��li' �'�1�1�5��2 PhoneNumber: ��� ��� r <br /> Nlailing Address: �/;�,,;�,�`" /f P�� f`�'%�� �� P City: ���i^r>cc(�' �P� <br /> ' Phone 1\Tumber: T y fy� <br /> Contractor's Name: ��G/�s=i`c��° � 1 <br /> l�iailing Address• ���f,� ,SrS— _ City: l.�r�7L?'`� Zip: .���3�5- � <br /> DO \TOT i�iAil. PAYI`IENT K'TTH THIS APPLICATION <br /> GE��RAL �'STRUCTIONS <br /> 1. Applications for septic system permits may be mailed or submitted in person at the Ciry <br /> Offices; however, permits will not be mailed out. The permit must be picked up in <br /> person at the City Offices and work must not begin unless the permit card is on the job <br /> site. <br /> 2. Permits will be issued only to contractors holding a City of Orono Septic System <br /> Installers License. <br /> 3. All work must be done in accordance with the approved septic system desi�n. Desi?n <br /> reports are not considered approved unless accompanied by the "City of Orono Septic <br /> System Approval" cover sheet si�ned by the City Inspector. <br /> 4. The followi.n� inspections will be required for all septic systems: <br /> A. Pre-installation site inspection to include i.nspector, installer, and general contractor. <br /> B. Tank i.nstallation prior to coverin�. <br /> C. Drainfield trench installation prior to coverin�. For mounds, inspection is required <br /> after rouQh-up but prior to sand placement (sand will be jar tested for silt content), <br /> and a�ain durin� pressure distribution pipin' installation in the rock bed. <br /> D. Final inspection to verify proper final cover depths and to verify that all pump station <br /> (where required) components are functional and comply with codes. <br /> 5. Individual holdin�MPCA Installer Certificate shall be present durin� inspections: A 24- <br /> hour notice is required for all inspections. <br /> ���i' <br /> V\ <br />