My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1997-009436 - replacement system
Orono
>
Property Files
>
Street Address
>
H
>
Heritage Lane
>
1025 Heritage Lane - 10-117-23-13-0008
>
Permits/Inspections
>
1997-009436 - replacement system
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 3:19:08 PM
Creation date
1/24/2017 11:37:48 AM
Metadata
Fields
Template:
x Address Old
House Number
1025
Street Name
Heritage
Street Type
Lane
Address
1025 Heritage Lane
Document Type
Permits/Inspections
PIN
1011723130008
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
9 <br /> PUMP SELECTION PROCEDURE <br /> A. Determine pump capacity: <br /> Gravity Distribution <br /> 1. Minunum suggested is 20 gpm <br /> 2. Maximum suggested is 45 gpm Perforation Discharges in GPM <br /> Pressure Distibution Head Perforation diameter <br /> feet inches <br /> 3.a. Select number of perforated laterals 7/32 �/4 <br /> b. Select perforation spacing= feet. 1.oa o.56 0.74 <br /> c. Subtract 2 ft.from the rock layer length. 1.5 0.90 <br /> Rock layer length <br /> -2 ft. = feet. z.ob o.so i.o4 <br /> d. Determine the number of spaces between perforations. a Use i.o fooc single homes. <br /> Length perf.spacing= ft.= ft. = spaces b Use 2.0 teet for anything eLse. <br /> e. spaces+1 = perforations/lateral <br /> f. Multiply perforations per lateral by number of laterals to <br /> get total number of perforations. r�r x �r 5,�e�� = perforations. <br /> g. T x�m �r = gpm. <br /> SELECTED PUMP CAPACITY,��gpm <br /> B.Determine head requirements: <br /> 1. Elevation difference between pump and point of discharge. <br /> __j__�feet <br /> 2. If pumping to a pressure distribution system,five feet for pressure Soil t�eatmentsystem <br /> required at manifold if gravity s stem,zero. °�°="='o• <br /> ��feet Total pipe lengrh <br /> 3. Friction loss �4� <br /> a. Enter friction loss table with gpm and pipe diameter. r„�e .- Elevation Diffeience <br /> Read friction loss in feet per 100 feet from table(F-14). P`� <br /> ------- -- - <br /> F.L._ •O(o ft./100 ft of pipe . <br /> ................. . <br /> b. Determine total pipe length from pump to discharge '-'"'---"""�-----�""'��""""��"�"---- <br /> point. Estimate by adding 25 percent to pipe length for fitting <br /> loss,or use a fitting loss chart(F-15 feet). <br /> Equivalent pipe length-125 times ip length= <br /> 'JS_. X 1.25=�feet Friction Loss in Plastic Pipe <br /> c. Calculate total friction loss by multiplying <br /> Nominal <br /> friction loss in ft/100 ft y equivalent pipe length. pipe dia. <br /> Total friction loss= �,x�¢f�=100= 2- feet �ow Rate <br /> 4. Total head required is the sum of elevation difference, �m 1.5" 2" 3" <br /> special head requirements,and total friction loss. <br /> 20 2.47 0.73 0.11 <br /> � �" +_� + � 25 373 1.11 0.16 <br /> (1) (2) (3c) � 523 0.23 <br /> 6.96 0.30 <br /> 40 8.91 2.64 0.39 <br /> TOTAL HEAD �_feet 45 11.07 3.28 0.48 <br /> 50 13.46 3.99 0.58 <br /> C. Pump selection bo 5.60 o.s2 <br /> 65 6.48 0.95 <br /> 70 7.44 1.09 <br /> 1. A pump must be selected to deliver at least <br /> �gpm (Step A) with at least �feet of total head (Step B). <br />
The URL can be used to link to this page
Your browser does not support the video tag.