My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
septic info
Orono
>
Property Files
>
Street Address
>
H
>
Heritage Lane
>
1025 Heritage Lane - 10-117-23-13-0008
>
Septic
>
septic info
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 3:19:11 PM
Creation date
1/24/2017 11:16:41 AM
Metadata
Fields
Template:
x Address Old
House Number
1025
Street Name
Heritage
Street Type
Lane
Address
1025 Heritage Lane
Document Type
Septic
PIN
1011723130008
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Septic System Upgrade Deadline is Approaching <br /> Here's a friendly reminder to all Orono property owners with non-compliant onsite septic <br /> systems. Beginning in the mid-1990s the City began to identify those septic systems that <br /> made use of trench drainfields, a majority of which do not maintain the minimum <br /> required vertical separation above seasonal water tables. Each existin� system was <br /> subjected to soil borings to determine the seasonal water table depth. When a system was <br /> identified as non-compliant, the owner was notified of the need to bring the system into <br /> compliance and given several years to coinplete the upgrade. <br /> The deadlines to upgrade were divided into whether or not the property was in the <br /> Shoreland District (within 1000' of a lake, or within 300' of a protected tributary stream). <br /> Properties in the Shoreland District were given until December 31, 2007 to become <br /> compliant. Properties outside the Shoreland area with non-compliant systems were <br /> aiiowed uniil Decetnber 31, 2010 �o conform to the septic code. <br /> Don't wait until the last minute! The City is strongly recommending that property <br /> owners not wait until the deadline arrives to bring their systeins into compliance. The <br /> proces� to upgrade your septic system can be quite lengthy. The first step in the process <br /> is to hire a site evaluator & designer to determine what type of system is required and <br /> provide the blueprint for the system installation. The property owner must then contract <br /> with a septic system installer to have the system constructed. <br /> The installation of septic systems is very weather dependent, especially for mound <br /> systems, which can only be installed when the ground is relatively dry, i.e. typically Jtme <br /> thru September. Contractors' schedules fill up quickly, so it's important to start your <br /> planning and design process now to ensure a timely installation. The period of time from <br /> deciding to update your septic system to the actual installation can easily e;cceed tluee to <br /> four months or more. Please contact the Building and Zoning Department at (952-249- <br /> 4600) with any questions you may have about bringing your septic system into <br /> compliance. <br /> For a list of licensed designers and installers you may go to ov`��«.ci.or��m.a��n.aas, <br /> click on City Departments, click on Septic, then click on the link to <br /> wtivw.pca.state.mn.us/pro Qrams. <br />
The URL can be used to link to this page
Your browser does not support the video tag.