My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1994-005859 - renovate inside
Orono
>
Property Files
>
Street Address
>
H
>
Heritage Lane
>
1000 Heritage Lane - 10-117-23-14-0005
>
Permits/Inspections
>
1994-005859 - renovate inside
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 3:19:37 PM
Creation date
1/23/2017 3:36:16 PM
Metadata
Fields
Template:
x Address Old
House Number
1000
Street Name
Heritage
Street Type
Lane
Address
1000 Heritage Lane
Document Type
Permits/Inspections
PIN
1011723140005
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0����, <br /> ;;�' � �1,' �\ <br /> ; <br /> ' O O <br /> _ '' CITY of ORONO <br /> ��� ,� ����. t�_• �, �''� <br /> a�, � ; E���' MunicipalOffices <br /> �:�� �� �.�r G�'� <br /> ' .� % Street Address: Mailing Address: <br /> �� �9 ` :¢,�i„%. <br /> `�-, l�EggO.� 2750 Kelley Parkway P.O. Box 66 <br /> �_ __ � Orono, MN 55356 Crystal Bay, MN 55323-0066 <br /> February 18, 2000 <br /> Gcorge &Nancy Risko�v <br /> 1000 Heritage Lane <br /> Wayzata, Mn 55391 <br /> Dear Mr. & Mrs. Riskow: <br /> The above described property is in a Metropolitan Urban Service Area(MUSA) for sanitary sewer <br /> installation. The factors for initiating the sewer project were smaller lot sizes and non-compliant septic <br /> systems �ti�ith limited replaccment sites available. The residence was required to coruiect to the sewer <br /> system no later tl�an February 14, 2000. Recently, the City Council adopted a resolution allowing all <br /> sewer connections to coincide�vith the septic system upgrade time frame. The time frame for a septic <br /> system upgrade is seven to ten years from the inspection date dependant upon the property's location. <br /> Your property will nced to connect to the sanitary sewer system no later than December 31, 2001, �vhich <br /> is the date your septic system was to be upgraded. A Sewer Availability Charge (SAC) fee will need to <br /> be paid to the City in the year the se���er connection is made. A licensed plumber must then obtain a <br /> pennit from the City to make the comiection from the residence to the actual se�ver line. <br /> If at any time before December 31, 2008 the residence undergo's a remodcling project that will increasc <br /> the total water use, the residence must thcn connect to the sanitary se�ver system. If at any time beforc <br /> the above date die s_ystem is failing, the residence must then inunediately comiect to thc sanitary sewer <br /> system. <br /> Nlinor maintenance can and should still be conducted on your septic system. Puinping the septic tanks, <br /> repairing or replacing pumps, and replacement of septic tank bafflcs are examples of acceptable repairs. <br /> If the septic system needs major maintenance, such as septic tank replacement or drainfield replacement, <br /> connection to the sanitary se���cr system�vill be required. <br /> If there are any questions regarding this letter, please contact me at (612) 249-4600. <br /> Re ctfullv, <br /> , �i1%%tiv <br /> Chris Pence <br /> On-Site Systems Mana�er <br /> Telephone(612)249-4600 • Fax(612)249-4616 <br />
The URL can be used to link to this page
Your browser does not support the video tag.