My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
septic info
Orono
>
Property Files
>
Street Address
>
H
>
Heritage Lane
>
1000 Heritage Lane - 10-117-23-14-0005
>
Septic
>
septic info
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 3:19:39 PM
Creation date
1/23/2017 3:26:24 PM
Metadata
Fields
Template:
x Address Old
House Number
1000
Street Name
Heritage
Street Type
Lane
Address
1000 Heritage Lane
Document Type
Septic
PIN
1011723140005
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
. .. . �JI�iP SELECTION PROCEDURE <br /> A. Determine pump capadty: <br /> Gravity Distribution END PERFORATION OF A PERFORA7ED LATERAL <br /> 1. Minimum suggested is 600 gallons per hour(10 gpm)to stay ahead of �--c,,..c,�., <br /> water use rate. <br /> Topwll -� <br /> 2. Maximu��n�s�ugges livery to a drop box of a home system is 2,7(?0 , <br /> �.,loyer of Geoiutil� FaDrlc(u tar- <br /> gallons r hour(4�gpm) prevent build-up of pressure in drop box. ��mY so� �Y.. -��„��,a,.�.o,�,y,..,.,,<<a�,, <br /> >,.,,�«a .o.����� <br /> ,, <br /> er or I o e a Perlo�otion Orilled Horitonlolly <br /> Pressure Distribution • • ���o p �ar Top <br /> �/�Fut A1 Leasl 12�lo Edqt <br /> 3. a. Select number of perforated ]aterals ` ; F��e q«k� .,:••' o� r�k �r�, <br /> b. Select perforation spacing= ft. � ' ` P.;raa,io��'���.a o� <br /> c. Subtract 2 ft.from the rock layer length. _ <br /> � Cl�an Sond l.oytr Boi�om ol Lateral <br /> Y�-�-z Ir _ --ft. . , . ._ , <br /> Oripinol Soll Properly Scarilitd <br /> � &(ore Plocl�p Sard Loyer <br /> d. Determine the number of spaces between perforations. <br /> Length perf.spacing=- ft.d Et.- s�aces TABLE OF PERFORATION DISCHARGFS IN CPM <br /> e. �-spa�-1 - --- perforations/lateral <br /> ' f. Mulriply perforaHons per lateral by number of laterals to Head Perforation diameter(inches) <br /> get total number of perforations. <br /> ��`�"x ---�-��- --perforations. ��" ��' <br /> 1.0a OS6 0.74 <br /> 7 S 0.69 0.90 <br /> g' �gP,,,-r-►�r=�--gPn'' 2.ob a.so �.oa <br /> 2S 0.89 1.77 <br /> 3.0 0.98 1.28 <br /> SELECTED PUMP CAPACITY gpm Y�d}JZ. 4.0 1.13 t.a� <br /> 5.0 1.26 1.65 <br /> B.Determine head requirements: <br /> aUse 1.0 foot of head for residential systems. <br /> 1. Elevadon difference between pump and point of discharge. bUse 2.o E�c ot head for oct,er estabtuhn,encs <br /> ��feet <br /> 2. If pumping to a pressure distribution system,add five feet for pressure <br /> required at manifold <br /> - feet <br /> 3. FriCtion loss Pipe Length <br /> a. Enter friction loss table with gpm and pipe diameter. � Poin�of D;scharge <br /> Read friction loss in feet per 100 feet fro�n table. � `�I.p <br /> F.L._ ,�� ft./100 ft of pipe Elevation Difference <br /> b. Determine total pipe]ength from pump to discharge Pump SS,� <br /> point. Add 25 percent to pipe length for fitting 3 � � <br /> loss,or use a fitting loss chart. Equivalent pipe F-18b <br /> length-125 rimes pipe lcn�th = <br /> 1.5 inch 2.0 inch 3.0 inch <br /> ��x 1?5 =��(�feet gpm Friaion lou per 100 ft of pi�e <br /> c. Calculate total friction loss by multiplying 10 0.69 0.20 <br /> friction loss in ft/100 ft by equi��alent pipe length. 12 0.96 0.28 <br /> Total friction loss= ? .� f- x /S� �100=_�feet 14 1.28 038 <br /> •S. Total head required is the sum of elc�•ation difference, 16 1.63 0.48 <br /> 18 2.03 0.60 <br /> special head requirements,and total friction loss. 20 2.47 0.73 0.11 <br /> 25 3.73 1.11 0.16 <br /> :C. + - +�_ 30 5.23 1.55 0.23 <br /> (1) (2) (3c) 35 7.90 2.06 0.30 <br /> 40 11.07 2.64 0.39 <br /> _4�.____14.73_ 28_- 0.48 <br /> TOTAL HEAD � �. feet 50 3.99 0.58 <br /> 55 4.76 0.70 <br /> 60 5.60 0.82 <br /> C. Pump selection .�.,,1�X <br /> 1. A pump must be selected to deliver at least 4� gpm (Step A) <br /> with at least � I feet of total head (Step B). <br />
The URL can be used to link to this page
Your browser does not support the video tag.