My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2002-P05919 - demo
Orono
>
Property Files
>
Street Address
>
H
>
Heritage Drive
>
1955 Heritage Drive - 10-117-23-13-0014
>
Permits/Inspections
>
2002-P05919 - demo
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 3:19:22 PM
Creation date
1/23/2017 3:01:25 PM
Metadata
Fields
Template:
x Address Old
House Number
1955
Street Name
Heritage
Street Type
Drive
Address
1955 Heritage Drive
Document Type
Permits/Inspections
PIN
1011723130014
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� <br /> � � <br /> CITY OF ORONO APPLICATION FOR DEMOLITION PERMIT <br /> P.O. Box 66 (2750 Kelley Parkway) <br /> Crystal Bay, MN 55323 - <br /> " SPECIAL CONDITIONS & HOLD HARMLESS AGREEMENT <br /> General Instructions <br /> 1. You may be required to obtain other permits, i.e. well abandorunment, etc. <br /> 2. Work must not begin unless the permit card is available on the job site. <br /> 3. A 24 hour notice is required for all inspections. Call (612) 249-4600. <br /> JOB SITE ADDRESS: ��1 �� I��rn�-t� `�Z �D r': <br /> Occupancy Type: X Residential Commercial <br /> c <br /> OWNER'S NAME• s��n� fu�- �v� tt%�p� , �,�L . Phone: C�I -;��C� �- 1��3� <br /> Mailing Address: ��i�c� c.i,��•�e-rs l�cy � ��c City: ��� w��V 2��3-i <br /> CONTRACTOR'S NAME: ���-��— Bus.No.: <br /> Mailing Address: City: <br /> Demolition if planned by means of: manual disassembly <br /> _�heavy equipment <br /> Permits Issued: <br /> # Well Abandonment <br /> In return for issuance of said Demolition Permit,the undersigned owner hereby agrees as follows: <br /> 1. The structure(s) shall be kept enclosed andlor secured until such time as demolition is <br /> complete. <br /> 2. Demolition debris will be kept off adjoining property and/or the public rights-of-way unless <br /> specific prior approval is obtained in writing for temporary use thereof. <br /> 3. Foundations shall be completely removed from the ground. <br /> 4. All demolition debris shall be completely disposed of off site in accordance with all <br /> applicable PCA requirements. <br /> 5. Water wells must be abandoned in accordance with State Health Department regulations. <br /> 6. Inspection required when all debris has been removed, before backfilling. <br />
The URL can be used to link to this page
Your browser does not support the video tag.