Laserfiche WebLink
David and Margaret Vergeyle . <br /> June 28, 1994 <br /> Page 2 . <br /> You are required to take corrective action as follows: <br /> 1, Immediately (within 24ca�on and a second barri r 20 f et lakeward of hhehfirstt <br /> fencin� at its current lo <br /> 2_ Within 7 days, restore the slope on the lakeside of the residence to its original <br /> location and �rade as shown on the approved site/grading plan. Remove sed'une�ne <br /> that has accumulated lakeward of the silt fence. Upon completion of a <br /> restoration, immediately establish measures to prevent further erosion and <br /> sedimentation. <br /> 3. Within 14 days, submit a vegetation restoration schedule prepared by a registered <br /> landscape architect, which plan shall include vegetative materials to restore a <br /> slope stabilizin� root structure, re-establishment of understory, and replacement <br /> of trees on an inch for inch replacement (approximately 150" total diameter of <br /> replacement trees). <br /> 4. Tree and vegetation restoration shall occur this arowing season. A Certificate of <br /> Occupancy shall not be issued until vegetation restoration is completed. <br /> Failure to adhere to the above schedule shall result in all home construction work at the site <br /> being irnmediately stopped. <br /> A copy of Resolution No. 3406, the approved site and grading plan, and copies of the pertinent <br /> ordinances are enclosed. <br /> If you have any questions, please contact me or Zonin� Administrator Jeanne Niabusth at 473- <br /> 7357. <br /> Sincerely, <br /> ���� �� <br /> Michael P. Gaffron <br /> Assistant Planning & Zoning Administrator <br /> MPG/lsv <br /> cc: Jeanne A. Mabusth, Building & Zoning Administrator <br /> Lyle Oman, Building Official <br /> Bruce Van�, Field Inspector <br /> Tom Barrett, City Attorney <br /> Ceil Strauss, DNR <br /> Orono City Council <br />