My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-00891 - mound septic
Orono
>
Property Files
>
Street Address
>
G
>
Graham Hill Road
>
3375 Graham Hill Road - 05-117-23-11-0018
>
Septic
>
2015-00891 - mound septic
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 5:15:47 PM
Creation date
1/17/2017 12:09:47 PM
Metadata
Fields
Template:
x Address Old
House Number
3375
Street Name
Graham Hill
Street Type
Road
Address
3375 Graham Hill Rd
Document Type
Septic
PIN
0511723110018
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
s. <br /> M <br /> City of Orono Septic System Approval <br /> ISTS DESIGN <br /> YES NO NA <br /> ISTS design specifications shall include proposed flows or other sizing information, minimum sewage tank <br /> capacity, minimum soil treatment area requirements,a plan of the component layout and all other information <br /> necessary to assure the City that the ISTS is designed and will be constructed to receive,treat and dispose of all <br /> of the sewa e from the buildin served. <br /> Setbacks <br /> Feature Sewa e Tank feet Soil Treatment Area feet <br /> Dee well 50 50 <br /> / Wetland 50 50 <br /> � General Develo ment Lake 75 75 <br /> /' Recreational Develo ment Lake 75 75 <br /> � Natural Environment Lake 150 150 <br /> r' Tributaries/Streams 75 75 <br /> � Drivewa s, sidewalks, decks and other hardcover 10 10 <br /> Pro ert lines, buildin s and buried i es 10 20 <br /> Lawn s rinkler s stems 10 10 <br /> Sewa e Tanks. <br /> Number of Bedrooms Tanks Liquid Capacities(gallons) <br /> 4 r less 1,000+ 1,000 re ardless of arba e dis osal use <br /> 5 0 6 1,250 + 1,000 re ardless of arba e dis osal use <br /> r- or 9 1,500 + 1,500 re ardless of arba e dis osal use <br /> 10 or more Sewa e tanks shall be sized as other establishments er MN Rules 7080. <br /> Pumping Stations. <br /> In order to standardize installation and electrical connection methods,the following pumping station requirements <br /> must be met in addition to MN Rules cha ter 7080 <br /> Electrical connection: <br /> A waterti ht, lockable electrical box must be mounted on a four-inch b four-inch treated redwood or cedar ost. <br /> All electrical connections shall be made within the box. Pump connection must not be made using a direct line <br /> � lu -in onl . Wire ent to the electrical box shall be sealed with a waterti ht material such as foam or utt . <br /> � Alarm and um floats shall be on se arate electrical circuits. <br /> Electrical wire from the power supply must not run over any tanks and must be laid beside the tanks and placed in <br /> � conduit alon the electrical ost. <br /> Electrical cords from the pump and floats must be run through a two-inch PVC(or equivalent)conduit(schedule <br /> � 80)with a one-inch gap between the conduit and the electrical box. Electrical cords must not run through or under <br /> the manhole cover. Wires must not have round contact. <br /> Pum in Chamber: <br /> Pressure pipe exiting the pumping chamber must be laid on a uniform slope up to the soil treatment area for <br /> proper drain back. The pressure pipe must be sleeved and inside a larger diameter pipe for additional support if <br /> spanning ground that has been excavated. If the pipe at the tank must be lower than union to get elevation for <br /> drain back, a one- uarter inch wee hole must be used. <br /> When soil depths above the pressure distribution pipe is less than 3'/z feet, insulation must be added to achieve <br /> / an insulating factor equal to 3'/z feet of soil to decrease the potential for freezing(Styrofoam or concentric piping <br /> are acceptable methods). Piping under hardcover, such as tennis courts or driveways shall be insulated pipe or <br /> e uivalent. <br /> � A reserve capacity equaling 75%of the anticipated daily flow must be allowed into the pumping chamber between <br /> the alarm activation level and the um tank inlet. <br /> Protection of drainfield area. <br /> Proposed drainfield areas shall be identified and marked off on the lot at the time of the site evaluation and prior to <br /> any construction or grading occurring in the area. The drainfield area shall remain undisturbed until drainfield <br /> construction is commenced. No vehicular traffic shall be allowed in the drainfield area either before or after <br /> drainfield installation. <br /> ACCEPTED DENIED y the Metro West on ehalf of the City of rono subject to existing regulations and the <br /> following conditions: /✓e�]�t.f /I•l �i f' �L �t*� �. c . <br /> Insp ctions required: Ss� ! �oi'f, <br /> x 1. �4�.l��' f /�o ���,v� — p2�� �a� 5. <br /> 2. �q.� o�/K � .,.. � f�wK a.f0 6. <br /> p( 3.�'i.,A � �svt� �►a.� �� M7. � 7. <br /> �. ` 2�.s� � a...� A .. C' �oet8. <br /> B : Printed Name: L m/Zb N IC O f7�V t��t! Date: � / <br /> w:\septic\septic system approval revised 2-2015.docx <br /> Page 2 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.