My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-00363 - septic mound system
Orono
>
Property Files
>
Street Address
>
G
>
Graham Hill Road
>
3355 Graham Hill Road - 05-117-23-11-0008
>
Septic
>
2010-00363 - septic mound system
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 5:15:22 PM
Creation date
1/12/2017 3:54:40 PM
Metadata
Fields
Template:
x Address Old
House Number
3355
Street Name
Graham Hill
Street Type
Road
Address
3355 Graham Hill Rd
Document Type
Septic
PIN
0511723110008
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4. MOUND SIZING <br /> A. Calculate Clean Sand Lift: 3 feet minus Depth to Limiting Condition (1.C) = C(eon Sond Lift (1 ft minimum) <br /> 3.0 ft - 1.7 ft = 1.3 ft <br /> B. Calcutate Upstope Height: Clean Sand Lift (4.A) +media depth (1 ft.) +cover (1 ft.) =Upslope Height <br /> 1.3 ft + 1.0 ft + 1.0 ft= 3.3 ft <br /> D-3d:Slope blultiplier Table <br /> Land 5(opQ� 0 � 2 3 4 5 4 7 8 9 10 1f 12 13 14 15 16 17 18 19 20 21 22 23 l4 15 <br /> Upslope 3:i 3.i�: 2.'vl 2.83 2.75 Z.58 2.61 2.Sa 2.aa 2.�< L35 ..31 Z.25 2.�t 2.i7 1.13 ZA9 2.u5 LO? 2.0o 1.97 1.95 1.53 i.i t.ev 1.87 1.85 <br /> Berni R._ib �i:l 4.0.� 3.65 3.70 3.57 3.�i5 3.33 3.Z3 3.12 3.:3 2.9-1 2.55 2JE i?G 2.62 2.55 2.d8 L41 2.35 2.29 2.23 2.18 2.13 Z.6d 2.G I.id 1.93 <br /> l.and Slope'=.. 0 1 2 3 4 5 5 7 8 9 10 I I 12 13 Id 15 16 17 I8 19 20 21 22 23 24 25 <br /> Uot•JnSlOpe ;:I ?.�C 3.09 3.15 3.3D 3.JI 3.53 't.55 3.80 3.95 J.11 d.29 d..t8 d.69 J.95 5.1d 5.55 5.88 61d 6.63 7.p.1 7.d7 7.93 8.d2 8.93 9..76 t0.Q2 <br /> Berni Ratio -�:I .:.�10 J.17 4 i5 d.Si 4.76 S.GO 5.26 5.56 S.�d 6.25 6.67 7.id 7.69 8.29 8.92 v.S7 li�.�d 10.5-t U.67 12.:2 13.19 53.99 S.i.?Z 15.67 1f,5-1 17..W <br /> �. Setect Upslope Berm Mu(tip(ier <br /> (based on land slope): 2•4$ (figure D-34) <br /> D. Calculate Upslope Berm Width: Multiplier (4.C)X Ups(ope Mound Height (4.B) = Ups(ope Berm Width <br /> 2.48 ft X 3.3 ft = 8.0 ft <br /> E. talculate Drop in Elevation Under Bed: Bed Width (2.B) X Lcmd Slope (1.D) : 100=Drop (ft) <br /> 10.0 ft X 15.00 % : 100= 1.50 ft <br /> F. Calculate Downs(ope Mound Height: Upslope Height (4.B) +Drop in Elevation (4.E) =Downslope Height <br /> 3.3 ft + 1.50 ft = 4.8 ft <br /> � Select Downslope Berm Mul tip(ier <br /> (based on land slope): 5.55 (figure D-34) <br /> H. Calcutate Downslope Berm Width:Multiptier (4.G)X Downs(ope Height (4.F) =Downs(ope Berm Width <br /> 5.55 x 4.8 ft = 27.0 ft <br /> I. Catculate Minimum Berm to Cover Abso�ption Area:Downs(ope Absorption Width (3.6 or 3.C) +4 ft. =ft <br /> 10.0 ft + �� ft = 14.0 ft <br /> J. Design Downs(ope Berm =greater of 4H and 41: 27.0 ft <br /> K. Select Ends(ope Berm Mu(tiptier: 3.00 (usuatly 3.0 or 4.0) <br /> L. Calculate Endslope 8erm (4.K)X Downs(ope Mound Height (4.F) =Endslope Berm Width <br /> 3.00 ft X 4.8 ft = 15.0 ft <br /> M. Calcutate Mound Width: Ups(ope Berm Width(4.D) +Bed Width (2.6) +Downslope Berm Width (4.J) =ft <br /> 8.0 ft + 10.0 ft + 27.0 ft = 45.0 ft <br /> N. Calculate Mound Length: Endslope Berm Width (4.L) +g�d Length (2.C)+ Endslope Berm Width (4.L) =ft <br /> 15.0 ft + 63.0 ft + 15.0 ft = 93.0 ft <br /> 5. ORGANIC LOADING: (Optional} <br /> A. Orgonic Loading = Design Flow X Estimated BOD in mg/L in the effluent X 8.35 = 1,000,000 <br /> 750 gpd X mg/L X 8.35 : 1,000,000 = �lbs BOD/day <br /> B. Calculate System Orgonic Loading: lbs. BOD (5.A) :Bed Area (2.A) = lbs/day/ft2 <br /> �_-�lbs/day = �ft� _ �tbs/day/ft2 <br /> C. Recommended Organic Loading Rate: �lbslday/ftZ <br />
The URL can be used to link to this page
Your browser does not support the video tag.