My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-00731 - septic mound system
Orono
>
Property Files
>
Street Address
>
G
>
Graham Hill Road
>
3340 Graham Hill Road - 05-117-23-11-0012
>
Septic
>
2012-00731 - septic mound system
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 5:15:35 PM
Creation date
1/12/2017 3:09:49 PM
Metadata
Fields
Template:
x Address Old
House Number
3340
Street Name
Graham Hill
Street Type
Road
Address
3340 Graham Hill Rd
Document Type
Septic
PIN
0511723110012
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� H. SAND VOLUME <br /> 1. Upslope Vo�ume+ Volume under rodcbed+Downslope Volume ocR kbed#1 S�'I L�J <br /> a.Upslope Volume:(depth of clean sand+1)x(upslope berm) x(mound length)/2=ft3 <br /> 2.5 ft x 9.5 ft x 59.0 ft /2 = 700.6 ft3 <br /> b.Volume under rodcbed: (average depth of sand under rodc)x(rockbed width)x(mound length)=ft3 <br /> 2.1 ft x 10.0 ft x 59.0 ft = 1239.0 ft3 <br /> c.Downslope Volume: (depth of dean sand+1)x(downslope berm)x(mound length)12=ft3 <br /> 3.7 ft x 18.0 ft x 59.0 ft / 2 = 1964.7 ft3 <br /> Total cubic feet: = 3904.3 ft3 <br /> 2. Divide ft3 by 27 ft31yd3 to get cubic yards <br /> 3904.3 /27 = 144.6 yds3 <br /> 3. Multiply cubic yards by 1.4 to get weight of sand in tons <br /> 144.6 yds3 x 1.4 202.4 tons <br /> 4 Add 10%for Construdability <br /> 202.4 tons x 1.1= 222.7 tons <br /> A-1 Estimated Sewage Flows in GPD <br /> No.of <br /> Bdrms Class I Class II Class III Class IV <br /> 2 300 225 180 60%of <br /> 3 450 300 218 the <br /> 4 600 375 256 values <br /> 5 750 450 294 in the <br /> 6 900 525 332 Ciass I, <br /> 7 1050 600 370 II or II <br /> 8 1200 675 408 columns <br /> D-33 Absor tion Width Sizin Table <br /> Perc Rate Soil Texture Loading Rate Absorption <br /> mpi gpd/sq ft Ratio <br /> Coarse sand <br /> <5 Loamy sand 1.20 1.00 <br /> Med.,Fine sand <br /> 6-15 Sand loam 0.79 1.50 <br /> 16-30 Loam 0.60 2.00 <br /> 31-45 Silt Loam,Silt 0.50 2.40 <br /> 46-60 Clay loam,Silty 0.45 2.67 <br /> or Sand Cla Loam <br /> 61-120 Silty or Sandy <br /> Clay or Clay 0.24 5 <br /> >120' <br /> *Must be other or performance. <br /> Page 3 of 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.