My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-00731 - septic mound system
Orono
>
Property Files
>
Street Address
>
G
>
Graham Hill Road
>
3340 Graham Hill Road - 05-117-23-11-0012
>
Septic
>
2012-00731 - septic mound system
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 5:15:35 PM
Creation date
1/12/2017 3:09:49 PM
Metadata
Fields
Template:
x Address Old
House Number
3340
Street Name
Graham Hill
Street Type
Road
Address
3340 Graham Hill Rd
Document Type
Septic
PIN
0511723110012
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• t ' <br /> Joseph Olson D.B.A. <br /> Rusty Olson's--Soil and Percolation Testing <br /> Joseph J. Olson--MPCA License#810 <br /> 11481 Riverview Rd. NE, Hanover, MN 55341 <br /> (763) 498-8779 Fax (763) 498-8290 <br /> Revised July 29,2012 ORONO COPY <br /> Stonewood LLC. <br /> 3340 Graham Hill Road <br /> Orono, Hennepin County <br /> This on-site Sewage Treatment System is designed for a Type l, Five-bedroom home in accordance with <br /> the Minnesota Pollution Control Agency Chapter 7080 and local ordinances. <br /> The periodically saturated soils were located at 18"-30"(mottled soil). Due to the periodically saturated <br /> soils,a pressurized mound system will need to be installed to treat the septic ef�luent. The bottom of the <br /> treatment area must be located at least 3' above the saturated soils. <br /> The soils at a depth of 12"have a percolation rate averaging 6 MPI. <br /> All tanks need to be insulated if there is less than two feet of cover over the top of the tanks. Clean outs <br /> must be installed on the end of the laterals for maintenance. <br /> ORONO COPY <br /> Use 7/32 inch perforations on the laterals. <br /> The absorption area of the future site does not encroach into the primary site. <br /> A 1250 gallon pumping chamber will need to be installed to lift the effluent to the treatment area. The <br /> power supply and Switches must be located outside the manhole and pumping chamber in a weatherproof <br /> enclosure.A warning device must be installed with light and sound devices;this is in case of a pump <br /> failure.The manifold and supply line must have back drainage to the pumping chamber. <br /> Keea all heavv equipment off of the proposed treatment areas before,durin�and after construction. <br /> The area around both sites must be fenced off bv the contractor before anv construction be�ins. <br /> With proper installation and maintenance,this system should have no problem in treating septic effluent <br /> effectively.Nothing other than gray water,(laundry,showers,etc.)Human water and toilet tissue should be <br /> disposed of into the septic tanks.Garbage disposals are not recommended.Additives must not be used they <br /> may cause harmful damage to your septic system. It is recommended that you pump the septic tanks every <br /> two years. <br /> Sincerely, <br /> . ........__.,.... . ... <br /> ORONO COPY �Ty OF ORONO <br /> ,� Joseph J.Olson <br /> sFrrcc �uvur IE <br /> 1NSPECTOR <br /> D T � ERMIT NQ <br /> APPROV�D AS 6t18MIT'fED <br /> �] APPROVED WITH CORRECiTIfNS 11s NOTiW <br /> ���� Q NOT APPROHBRCORRECT t RE9UBMt7 <br /> � These commertcs aee for yo�r iafcrautiva Ai!wak abs1141a� <br /> _.,._BEDROOMS, ��Hq���w� iu fnll compliance Mi►h ati applicable ceptic�ad soaia�{cude. <br /> p��� „�+�DL� Itequirements includi�itear�aot rpeciticYlly tated fa iMi�to�MR. <br /> ���+�W�YAUQATES THIS D�� 10EEP THiS PLAN SBT ON StTB AT ALL TIM6i <br />
The URL can be used to link to this page
Your browser does not support the video tag.