My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-00024 - septic
Orono
>
Property Files
>
Street Address
>
G
>
Graham Hill Road
>
3240 Graham Hill Road - 05-117-23-11-0010
>
Septic
>
2008-00024 - septic
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 5:15:27 PM
Creation date
1/12/2017 12:24:06 PM
Metadata
Fields
Template:
x Address Old
House Number
3240
Street Name
Graham Hill
Street Type
Road
Address
3240 Graham Hill Rd
Document Type
Septic
PIN
0511723110010
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
8. Balance flows for other lengths,spacing,or size. <br /> lf you end up with a lan7e spacing(5'is max)lower the initial spacing in#6 or the perf size in#5. <br /> Lateral2 GPM=length of pipe x gallons per minute per foot(7) <br /> 35.0 ft x 0.3 gpm/ft = 9.6 gpm <br /> #of Perts=GPM /flow rate(5.2) <br /> 9.6 gpm / 1.3 gpm= 7 #of Perfs(Check figure E-4) <br /> Spaang=(Length-2 feet)/(Number of perfs-1) <br /> ( 38 ft-2ft)/( 7 perfs- 1)= 6.0 feet <br /> Lateral 3 GPM=length of pipe x gallons per minute per foot(7) <br /> 0.0 ft x 0.3 gpm/ft = 0.0 <br /> #of Perfs=GPM /flow rate(5.3) <br /> 0.0 gpm / 0.0 gpm= 0 #of PerFs(Check frgure E-4) <br /> Spacing=(Length-2 feet)/(Number of perFs-1) <br /> ( 0.0 ft-2ft)/( 0 perfs- 1)= 0.0 feet <br /> Lateral 4 GPM=length of pipe x gallons per minute per foot(7) <br /> 0.0 ft x 0.3 gpm/ft = 0_0 <br /> #of Pe�fs=GPM /flow rate(5.4) <br /> 0.0 gpm / 0.0 gpm= 0 #of Perfs(Check f�u�E-4) <br /> Spacing=(Length-2 feet)/(Number of perFs-1) <br /> ( 0 ft-2ft)/( 0 perfs- 1)= 0.0 feet E-20 Volume of Li uid in Pi e <br /> Pipe Diameter Liquid per foot <br /> Lateral 5 GPM =length of pipe x gallons per minute per foot(7) inches allons <br /> 0.0 ft x 0.3 gpm/ft = 0.0 1 0.045 <br /> #of Perfs=GPM /flow rate(5.5) 1.25 0.078 <br /> 0 gpm / 0.0 gpm= 0 #of Perts 1.5 0.11 <br /> Spacing=(Length-2 feet)/(Number of perFs-1) 2 0.17 <br /> ( 0 ft-2ft)/( 0 pe►fis- 1)= 0.0 feet 2.5 0.25 <br /> 3 0.38 <br /> 9. Calculate total gpm for system-the total GPM need from the pump 4 0.66 <br /> Lateral 1 Flow= 9.6 gpm <br /> Lateral 2 Flow= 9.6 gpm <br /> Lateral 3 Flow= 0.0 gpm <br /> Lateral 4 Flow= 0.0 gpm <br /> Lateral 5 Flow= 0_0 gpm <br /> Total= 19.2 gpm 3 X 19.2=58 gpm <br /> 10. Summary <br /> Enter the minimum i size that allows for even distribution and the volume of li uid in the E-20. <br /> Pipe Size Pipe Volume Pipe Length Total Volume Perf Size Spacing <br /> in aUft ft to Fill al in ft <br /> Lateral1 1.5 0.11 38.0 4.18 1/4 3.0 <br /> Lateral2 1.5 0_11 38.0 4.18 1/4 6.0 <br /> Lateral 3 0.0 0 0.00 0.0 <br /> Lateral 4 0.0 0 0.00 0.0 <br /> Lateral 5 0.0 0 0.00 0.0 <br /> Total = 8.36 gal <br /> This is the total volume to fill the laterals <br /> Amount per pose should be 4-5 times this. <br /> 8.36X3=25.08 <br /> I hereby certify that I have completed this work in accordance with�I applicable ordinances,rules and laws <br /> (signature) 810 (license#) _2J11/08 (date) <br /> Page 2 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.