Laserfiche WebLink
ALL SArTITARY SEWER AND MiJriICIPAL WATER CONNECTION CHARGES(If not previously assessed or if an improvement project is not deemed to be required <br /> in the sole discretion of the City. If an improvement is required, the connection charge may be in addition to any assessment.) <br /> The connection charge for properties wishing to connect to the sewer or water but which are located outside the delineated boundaries of the affected project area shall <br /> be charged the connection fee for that area. Such connections are subject to City Council approval. <br /> 1997 SEWER <br /> 97-1 North L.L./L.L.C.0 $19,885.00 (6) <br /> 97-2 Bracketts Point $33,100.00 (6) <br /> 97-3 Bay Ridge $17,675.00 (6) <br /> 1998 - 1999 SEWER <br /> 1998 Shoreline/Heritage Sewer $16,700.00 (7) <br /> 99-1 Orono Orchard Sewer $16,415.00 (6) <br /> 99-2 Edgewood Hills Sewer $27,960.00 (6) <br /> CREDIT TO AREA: <br /> (1) 602-37691 Sewer Operating (� 308-37691 1992 Improve Stubbs Bay <br /> (2) 302-37691 1982 Lnprove&#6 By Pass (� 311-37691 1997 Improvements <br /> (3) 310.37691 1985 Improve Crystal Bay ('n 313-37691 1998-1999 Sewer Improvements <br /> (4) 406-37691 PIR Fund 1{7LS &Forcemain 2000 Fee Schedule—Page 12 <br />