Laserfiche WebLink
B. Jurisdiction. The provisions of this Section shall apply to the method of sewage <br /> disposal from every building within the City intended for human use or habitation,whether such use <br /> is permanent, temporary or seasonal, regardless of the date of original construction or use. <br /> 1. The owners of all buildings where municipal sewer is available or becomes <br /> available, shall connect the buildings to the municipal sewer subject to the following conditions. <br /> a. A code or compliant ISTS will not be required to be connected to <br /> municipal sewer until the ISTS becomes non-compliant or the building undergoes major remodeling <br /> resulting in an increase in water use that exceeds the capacity of the ISTS. A Certificate of <br /> Occupancy will not be issued until the building is connected to the municipal sewer. <br /> b. An ISTS that is non-compliant due only to a lack of a three foot <br /> separation must connect to the municipal sewer system within the same time frame that ISTS <br /> replacement would be required. <br /> c. A failing ISTS that is discharging sewage to the surface must be <br /> connected to the municipal sewer within ninety (90) days. <br /> 2. At the time connection to city sewer is completed,all existing septic tanks no <br /> longer in use shall be pumped out and filled with native soil. <br /> 3. The owners of those buildings which have been completely connected to <br /> municipal sewer sha11 be exempt from the maintenance and inspection provisions of this Section. <br /> C. Permits. A permit from the City of Orono is required for all construction, removal, <br /> alteration or repair of an ISTS within this municipality. A complete site evaluation and ISTS design <br /> must be approved by the City prior to the issuance of a permit. All permits must be issued to <br /> contractors who are licensed per Minnesota Rules 7080.0700-7080.0715 and all work must comply <br /> with this section. The City may reject permit applications that are incomplete or for repairs that do <br /> not meet the provisions of this section. The City may require additional inspections, removal or <br /> alteration of work performed which does not comply with the requirements of this section. The City <br /> reserves the right to deny additional permits to contractors who have failed to correct unsatisfactory <br /> work. The City maintains the right to pursue legal action or fines against anyone perfortning work <br /> on an ISTS without a permit. Construction relating to an ISTS that does not require a permit are <br /> listed below. <br /> 1. Repair or replacement of pumps,floats or other electrical devices ofthe pump. <br /> 2. Repair or replacement of baffles in the septic tank. <br /> 3. Installation or repair of inspection pipes and manhole covers. <br /> Page 4 of 17 <br />