My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ordinances 2nd series 1-180
Orono
>
Ordinances
>
Ord 1s and 2nd Series (historical)
>
Ordinances 2nd Series
>
Ordinances 2nd series 1-180
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/30/2015 2:14:07 PM
Creation date
3/30/2015 1:26:51 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
951
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Commercial, Industrial and Multi-Family Residential by Unit Tv e <br /> - residential type equipment per schedule above <br /> - furnace, boilers, unit heaters, and <br /> makeup air units $ 4.00 per 10, 000 btuh output <br /> - central air conditioning $ 10.00 per ton AC <br /> - exhaust fans $ 10.00 each <br /> - refrigeration $ 25.00 per compressor <br /> - fixed equipment with steam, hydraulic <br /> or compressed air system $ 2.00 per connection <br /> - fire sprinkler systems $ 2.00 per head/first 50 <br /> heads - .30 per head after <br /> initial 50 <br /> Plan reveiw 1/2 permit fee <br /> - fuel storage $ 20.00 permanent <br /> $ 10.00 temporary <br /> Page 6 of 14 � <br />
The URL can be used to link to this page
Your browser does not support the video tag.