My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ordinances 2nd series 1-180
Orono
>
Ordinances
>
Ord 1s and 2nd Series (historical)
>
Ordinances 2nd Series
>
Ordinances 2nd series 1-180
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/30/2015 2:14:07 PM
Creation date
3/30/2015 1:26:51 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
951
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
ALL MONICIPAL WATER CONNSCTION CHARGBS If not previously assessed or if an <br /> improvement project is not deemed to be required in the sole discretion of the <br /> City. If an improvement is required, the connection charge maybe in addition to <br /> any assessment) <br /> By District - Project <br /> _ Office Use Only <br /> *Credit to Fund <br /> 1967 LW-1 Hiqhway 12/Crystal Bay Road $3,284.90 per unit 1 <br /> + $24. 36 per F.F. � <br /> 1969 LW-2 Chevy Chase $3,255.38 per unit 1 . <br /> 1970 LW-1 Navarre Residential $1, 626.71 per unit 1 <br /> + $16.27 per F.F. <br /> 1970 LW-1 Navarre Commerical $2,440. 07 per unit 1 <br /> + $24.�0 per F.F. <br /> 1982-1A Navarro $1,733. 36 per unit 2 <br /> ON-SITE SYSTEMS (Ord. 210) <br /> Design Review Fees Included with permit fees <br /> Subdivision Site Evaluation Report Review $ 30 .00/per new lot <br /> Residential System Permit: <br /> Replace drainfield or replace 1/more tank $ 30. 00 <br /> Replace drainfield & replace 1/more tank $ 50.00 <br /> NeN Residential System $ 75.00 + $15.00 per each <br /> • inspection over 3 <br /> Non-Residential System Permit: <br /> New or Total replacement $100.00 + $20.00 per each <br /> inspection over 4 <br /> Partial replacement $ 60.00 + $20.00 per each <br /> inspection over 2 <br /> Outhouse Construction (New or replacement- Permit Fee & Plan Review Based <br /> Big Island Only) on Valuation of Project <br /> (per UBC 1985 Standard Schedule) <br /> Annual Service Charge $ 20.00/system/year plus <br /> An additional full fee for <br /> late penalty plus 8 $ <br /> interest for unpaid charges <br /> certified <br /> Section 12.30, Subd 8 (C) <br /> Water Connection Charges <br /> *Credit to Fund <br /> 1) 072-3753-000-00 2) 044-3753-000-004 <br />
The URL can be used to link to this page
Your browser does not support the video tag.