My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ordinances 2nd series 1-180
Orono
>
Ordinances
>
Ord 1s and 2nd Series (historical)
>
Ordinances 2nd Series
>
Ordinances 2nd series 1-180
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/30/2015 2:14:07 PM
Creation date
3/30/2015 1:26:51 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
951
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
• � ,. <br /> CONSTRUCTION PERMITS AND INSPECTION FEES (CONT) <br /> Applicable <br /> Permit Type Fee Code Section <br /> MUNICIPAL CONNECTION PERMIT <br /> Sewer $ 30.00 <br /> Water $ 30. 00 <br /> 5/8" meter $ 95. 00 <br /> 3/4" meter $ 130. 00 <br /> larger meter quote basis <br /> Mail-in postage & handling charge (sewer, $ 1. 50 <br /> water permits only) <br /> ON-SITE SYSTEMS (Ord. 210 ) <br /> Design Review Fees Included with permit fees <br /> Subdivision Site Evaluation Report Review $ 30. 00/per new lot <br /> Residential System Permit: <br /> Replace drainfield or replace 1 or more tank$ 30. 00 <br /> Replace drainfield & replace 1 or more tanks$ 50.00 <br /> New residential system $ 75. 00 + $15. 00 per <br /> - inspection over 3 <br /> Non-Residential System Permit: <br /> New or Total replacement $ 100. 00 + $20 . 00 per insp <br /> over 4 <br /> Partial Replacement $ 60.00 + $20. 00 per each <br /> inspection over 2 <br /> Annual Service Charge $ 20. 00/system/year <br /> plus 10� late penalty for <br /> unpaid charges certified <br /> INDIVIDUAL WELLS (Ord. 221j <br /> Installation Permit $ 30. 00 <br /> GRADING, EXCAVATION, FILLING <br /> Design Review Fees (staff only) included in permit <br /> 50 cubic yards or less (5 loads ) $ 100. 00 (staff permit) <br /> 51-100 cubic yards (max. 10 loads ) $ 200. 00 (staff permit ) <br /> 101 cubic yards or more $ 200. 00 + Cond. Use Permit <br /> NOTE: 101 cubic yards or more requires a Conditional Use Permit unless <br /> approved as part of a building permit. <br /> Page 6 of 13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.