Laserfiche WebLink
OFFICIAL SIII�IIKARY OF ORDINANCE NiTMBER 6 2 , SBCOND SERIES <br /> ORDINANC$ NO. 62 , S$COND SERIES AN ORDINANCE ADOPTING THE 1989 <br /> FES SCHEDIILE AN ORDINANCE RSPEALING ORDII�APC$ NO. 44 SECOND <br /> S$RIES, 49 SBCOND S$RI$S AND 49 S$COND S$RIES. <br /> The following is the official summary of Ordinance <br /> Number 62 , Second Series approved by the City Council of the <br /> City of Orono on January 9, 1989. <br /> The following sections have changes, additions and/or <br /> deletions: <br /> ZONING APPLICATIONS 1988 1989 <br /> Conditional IIse Permit w/variance new $ 50. 00 each <br /> variance <br /> Commercial Site Plan $150. 00 $200. 00+consultant <br /> fee <br /> Renewal Subdivision Application new 1/2 of current fee <br /> CONSTRUCTION PERMITS AND INSPECTION FEES <br /> BUILDING PERMIT � <br /> Normal Fee per 1982 UBC/SBC per 1985 UBC/SBC <br /> Standard Schedule Standard Schedule <br /> Plan Review Fee: <br /> Commercial per 1982 UBC/SBC per 1985 UBC/SBC <br /> Residential Standard Schedule Standard Schedule <br /> 65$ of Building 65$ of Building <br /> Valuation Data Valuation Data <br /> Retaining Walls (in excess of 42" also 30.00 min same <br /> multiple tiered walls that exceed 42" ' <br /> and not located in lakeshore protected area) <br /> Docks - Commercial new Per 1985 UBC/SBC <br /> standard schedule <br /> DEMOLITION PERMIT <br /> Principal Structure 30 .00 50.00 <br /> Accessory Structure 25.00 30.00 <br /> PLUMBING PERMITS 4. 00 5.00/fixture <br /> 2.00 3.00/fixture reset <br /> MECHANICAL PERMITS 15. 00 per 15.00 per 50,000 <br /> -furnace, boiler, unit heaters, and 30,000 btuh output <br /> makeup air units output <br /> -fuel storage (permanent or temporary) 15.00 30.00 <br /> MUNICIPAL CONNECTION PERMIT (together with area connection charges) <br /> 5/8" meter including sales tax 95.00 114. 48 <br /> 3/4" meter including sales tax 130.00 157.94 <br /> 1" meter including sales tax -- 212. 00 <br /> 2 <br />