My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ordinances 2nd series 1-180
Orono
>
Ordinances
>
Ord 1s and 2nd Series (historical)
>
Ordinances 2nd Series
>
Ordinances 2nd series 1-180
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/30/2015 2:14:07 PM
Creation date
3/30/2015 1:26:51 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
951
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
�LL SANITARY SEWER CONNECTION CHARGES (CONT.) <br /> The connection charge for properties wishing to connect to the sewer but <br /> which are located outside the delineated boundaries of the affected project <br /> area shall be charged the connection fee for that affected project area. <br /> Such connections are subject to City Council approval. <br /> ALL MUNICIPAL WATER CONNECTION CHARGES (If not previously assessed) <br /> B� District__ Project <br /> 1967 LW-1 Highway 12/Crystal Bay Road $3 , 164 . 64 per unit <br /> + $23 . 47 per F.F. <br /> 1969 LW-2 Chevy Chase $3,136. 20 per unit <br /> 1970 LW-1 Navarre Residential $1, 567 . 16 per unit <br /> + $15. 67 per F.F. <br /> 19701 LW-1 Navarre Commerical $2,350. 74 per unit <br /> + $23. 51 per F.F. <br /> 1982-1A Navarro $1, 669. 90 per unit <br /> ON-SITE SYSTEMS (Ord . 210) <br /> Design Review Fees Included with permit fees <br /> Subdivision Site Evaluation Report Review $ 30. 00/per new lot <br /> Residential System Permit: <br /> Replace drainfield or replace 1/more tank $ 30. 04J <br /> Replace drainfield & replace 1/more tank $ 5A. 00 <br /> New Residential System $ 75.08 + $15. 00 per each <br /> inspection over 3 <br /> Non-Residential System Permit: <br /> New or Total replacement $100 . 00 + $20. 010 per each <br /> inspection over 4 <br /> Partial replacement $ 6Ql. 410 + $20. 00 per each <br /> inspection over 2 <br /> Outhouse Construction (New or replacement- Permit Fee & Plan Review Based <br /> Big Island Only) on Valuation of Project <br /> (per UBC 1985 Standard Schedule) <br /> Annual Service Charge $ 20.04!/.system/year plus <br /> An additional full fee for <br /> late penalty plus 8 � <br /> interest for unpaid charges <br /> certified <br /> Section 12 . 30 , Subd 8 (C), <br /> 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.