My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ordinances 2nd series 1-180
Orono
>
Ordinances
>
Ord 1s and 2nd Series (historical)
>
Ordinances 2nd Series
>
Ordinances 2nd series 1-180
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/30/2015 2:14:07 PM
Creation date
3/30/2015 1:26:51 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
951
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
�ONSTRUCTION PERMITS AND INSPECTION FEES <br /> Applicable <br /> Permit Type Fee Code Section <br /> BUILDING PERMIT (Ord. 216 ) <br /> Minimum Fee $ 30.00 <br /> Normal Fee (per 1985 UBC/SBC Standard Schedule) <br /> Plan Review Fee: <br /> Commercial (per 1985 UBC/SBC Standard Schedule) <br /> Residential 65� of Building Permit Fee <br /> Building Valuation Standard (per Current I.C.B.O. Building <br /> Standards/Building Valuation Data) <br /> CERTIFICATE OF OCCUPANCY WITHOUT <br /> BUILDING PERMIT $ 30.00 <br /> DOCKS - RESIDENTIAL $ 30.00 <br /> DEMOLITION PERMIT (Ord. 216) <br /> Principal Use $ 30.00 <br /> Accessory Use $ 25. 00 <br /> LUMBING PERMIT $ 4.00/fixture <br /> Minumum Fee for any Plumbing Permit $ 30.00 per project <br /> Mail-in postage & handling charge $ 1.50 <br /> $ 2. 00/fixture reset <br /> MECHANICAL PERMIT <br /> Minumum Fee for any Mechanical Permit $ 30.00 per project <br /> Mail-in postage & handling charge $ 1.50 <br /> Residential, Single Family & Duplex by Unit Type <br /> -furnace or boiler with flue $ 25.00 each unit <br /> -wood stove with flue $ 35.00 <br /> -wood combination or add-on unit $ 30.00 <br /> -fireplace with flue $ 40.00 each unit <br /> -central air conditioning $ 25.00 each unit <br /> -exhaust fans (bath, kitchen, attic, etc. ) $ 5.00 each �ocation <br /> -solar space heating equipment $ 50.00 each system <br /> -solar water heaters $ 20.00 each unit <br /> -repairs and replacement of the above same as above <br /> -fire sprinkler systems $ 20.00/project <br /> -fuel storage $ 20.00 permanent <br /> $ 10.00 temporary <br /> -gas line inspection high/low pressure $ 30.00 <br /> Page 5 of 15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.