My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-00457 septic
Orono
>
Property Files
>
Street Address
>
G
>
Graham Hill Road
>
3215 Graham Hill Road - 05-117-23-14-0066
>
Septic
>
2011-00457 septic
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 5:18:55 PM
Creation date
1/9/2017 1:34:35 PM
Metadata
Fields
Template:
x Address Old
House Number
3215
Street Name
Graham Hill
Street Type
Road
Address
3215 Graham Hill Rd
Document Type
Septic
PIN
0511723140066
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
_ �STP Mound Desi�n UNTVERSTTY ` � <br /> Minnesota Poilution Worksheet ��MINNESOTA -`���� <br /> Control Agency -' <br /> 1• SYSTEM SIZING: <br /> A.Design F(ow(Design Summary tA): 750 GPD Table I <br /> 1SOUND CONTOUR LOADING FA7E5: <br /> B. So1(LoOding Rate (Desiqn Sum_2D): O_6O GPD/ft2 �,.,�ured "' Toxtura-darived Contour <br /> Dcrc Rata �R mouad-nbsorption-atio Loading <br /> C. Depth to Limiting Condition: 1 J ft _ Ra�4: <br /> D. Percent Land Slope (Design Sum.28)_ a.0 % S 6flmgi i.o,i.a.z.o.z..�.Z.s a�z <br /> E. Design Media Loading RQte: 1.2 GpD/ft2 67-126 rnpi oR s.a <_�z <br /> F. Mound Absorption Ratio: 2.0 �i29 mp�• %5.0• _5� <br /> G.Design Contour Looding Rate: 12 GPD/ft <br /> `Systems with these values are not Type I systems. <br /> (From Design Summary 2E-same as Linear Loading Rate) Contour Loading Rate is a recommended value. <br /> 2. DISPERSA[.MEDIA SIZING <br /> A. Catculate Required Disperso!Bed Area:Design Flow (1.A):Design MediQ Loading Rate (t.E)=ftZ <br /> If a larger dispersal media 750 GAD= 1.2 GPD/ft� = 625.0 ft2 <br /> area is desired,enter size: 630 ftz <br /> B. Calculate Dispersa!Bed�dth:Contour LoQding Rate (1.G}=Desi,qn Media LoQdinq RQie (1_E)=Bed Width <br /> 12 ft :- 1.2 gpd/ftz = 10.0 <br /> C. Calcutate Dispersa!Bed Length: IJispersnl Bed AreQ (2.A)=Bed�dth (2.B)=Bed Length <br /> 630.0 ftZ : 10.0 ft = 63.Q ft <br /> D. Select Dispersal MediQ: <br /> 3- ABSORPTION AREA SIZING <br /> Note:Mound setbacks are measured from the Absorption Area. <br /> A. Calculate Abwrption�dth:Bed�dth (2.B)X Mound Absorption RvYio (1.F)=Absorption�dth <br /> 4 0.0 t�c X 2.00 = 20.0 ft <br /> B. For slapes fronz 0 to 1%,the,4bsorptron�dth is meawred from the bed equatly in both directions_ <br /> Catculate,4bsorption�dth Beyond the Bed:Absorption Width (3.A)-Bed�dth (2.B)�2=�dth beyond Bed <br /> { N/A ft - N/A ft) = N/A = N/A ft <br /> C, For slopes>9%,Lhe Absorption Width is measured downhit[from the upslope edge of the Bed, <br /> Calculate Downslope Absorption Wrdth:Absorption�dth (3.A)-Bed�dth (2.S)=ft <br /> 20.0 ft - 10.0 ft = 10.0 ft <br /> Comments: <br /> Slope, CLR Choice,MQr.QriQ!�ss�es <br />
The URL can be used to link to this page
Your browser does not support the video tag.