My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-00801 - septic mound system
Orono
>
Property Files
>
Street Address
>
G
>
Graham Hill Road
>
3210 Graham Hill Road - 05-117-23-11-0009
>
Septic
>
2013-00801 - septic mound system
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 5:15:25 PM
Creation date
1/9/2017 12:07:05 PM
Metadata
Fields
Template:
x Address Old
House Number
3210
Street Name
Graham Hill
Street Type
Road
Address
3210 Graham Hill Rd
Document Type
Septic
PIN
0511723110009
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
'3. AB50RP'TION AREA SIZING <br /> Note:Mound setbacks are meawred from[he Absorption Area. <br /> A. Calculate Absorption Width:Bed Width (2.6)X Mound Absorption Ratio (1.F)=Absorption Width <br /> 10.0 ft X 2.0 = 20.0 ft <br /> B. For slopes>1%,the Absorption Width is measured dovmhill from the upslope edge of the Bed. <br /> Calculate Downslope Abwrption Wfdth:Absorption Width (3.A)-Bed Width (2.8)=ft <br /> 20.0 ft - 10.0 ft = 10.0 ft <br /> 4. MOUND SIZING <br /> A. Catculate Clean Sand Lift: 3 feet minus Depth to Limiting Condition (1.C)=C(ean Sandlift (1 ft minimum) <br /> 3.0 ft - 1.2 ft = 1.8 ft Design Sand Lift(optional): C��,g <br /> B. Calculate Upslope Height:Clean Sand Lift (4.A)+media depih (1 ft.)+cover (1 ft.)=Ups(ope Hetght <br /> 1.8 ft + 1,0 ft + 1.0 ft= 3.8 ft <br /> J�?d:SIoG�:Muitiplirr Tablr <br /> LEnd Slope°6 o I 2 3 4 5 6 7 B 9 IO I I 12 13 II i5 I6 il 18 19 20 2I 21 23 24 15 <br /> Upslnpp ,3:i 3,UC Z.9i L.BJ 2?S Z.�iB 1.51 Z.Sd Z..{) 1..{2 �.36 2.:1 2.25 2.i1 i'7..+3 LC9 L05 i.6; L�C i.4? I,55 1.S"s 1.St I.B9 1.87 �.8i <br /> Berm RaCo ly:t J.00 3.85 3.70 3.57 3.d5 3.33 3.23 3.�2 ).03 Z.9d 2.&6 2,16 2.10 2.62 2.95 Z.a8 2.at 2.35 2.29 2,23 2.18 2.i3 2.08 1.Oi I.98 1.93 <br /> land S�ope n 0 1 1 3 4 9 6 1 8 9 !Q 11 12 13 IA IS 16 il 18 1? 20 21 11 23 14 25 <br /> Grnmslope i3:1 3.00 ;.Oi s.'9 i.n i.al 3.53 i.66 3.&J 3.55 1.11 a.2� 4.d6 1.64:.95 5'(a 555 5.88 6.2a 6.61 7.1U 7..17 1.9i A.a't 3.93 9.J6 1Q.0'[ <br /> BPI"Ot Rd::O �y:l J.00 J.17:.35 a.5d 4.76 5.90 516 5.56 5.e8 6.25 6.6?7.ta 7.69 8.24 8.91 9.57 t0.ld 10.yd 11.67 12.J2 13.19 13,99 iJ,82 t5.61 16.5J 17..N <br /> � Setect Upslope Berm Multiplier <br /> �based on land slope): 2.48 (figure D-34) <br /> D. Ca�ulate Ups(ope Berm Width:Multipfier (4.C)X Upslope Mound Hefght (4.B)=Upslope Berm Width <br /> 2.48 ft X 3.8 ft = 10.0 ft <br /> E. Calculate Drop in E(evation Under Bed:Bed Width (2.6) X Land 5(ope (1.D)a 100=Drop (ft) <br /> 10.0 ft X 7.0 % + 100= 0.70 ft <br /> F. Calculate Uownslope Mound Height:Ups(ope Hefqht (4.6)+Drop in Elevation (4.E)=Downs(ope Height <br /> 3.8 n + 0.70 ft = 4.5 ft <br /> G Select Downslope Berm Multiplier <br /> (based on land slope): 5.56 (figure D-34) <br /> H. Calculate Downslope Berm YWdth:Multiplier (4.G)X Downslope Height (4.F)=Downsfope Berm Width <br /> 5.56 x 4.5 ft = 25.0 ft <br /> I. Calculate Minimum Berm to Cover Absorption Areo:Downs(ope Absorption Width (3.6 or 3.C)+4 ft.=ft <br /> 10.0 ft * �� ft = 14.0 ft <br /> J. Design Dovmslope Berm =greater of 4H and 41: 25.0 ft <br /> K. Select Ends(ope Berm Multiplier: 3.00 (usually 3.0 or 4.0) <br /> L. Calculate Endslope Berm (4.K)X Downslope Mound Height (4.F)=fnds(ope 8erm Widfh <br /> 3.00 ft X 4.5 ft = 13.0 ft <br /> M.Calculate Mound Width:Upslope Berm Width(4.D)+Bed Width (2.6)+pownslope 8erm Width (4.J)=ft <br /> 10.0 ft + 10.0 ft • 25.0 fc = 45.0 fc <br /> N. Calculate Mound Length:Endslope Berrrr Width (4.L)+Bed Length (2_C)+Endslope Berm Width (4.L)=ft <br /> 13.0 tt + 50.0 ft + 13.0 ft = 76.0 ft <br /> Comments: <br /> r <br />
The URL can be used to link to this page
Your browser does not support the video tag.