Laserfiche WebLink
i � � <br /> PRESSURE DISTRIBUTION SYSTEM Geotextile fabric <br /> V'G:u:'�::'x.5'=o'G'n..sl�"¢;{:+J'A.:1'. �fl�'L:oO.nDi.�;�l�n.�y.�M'vd'9!'�.;.�:.y:�r.,;r��. <br /> �C��C' J�.7��.y�.,an.;AU;l�'UC!`.ci.�l.4�.r;r;)�ct..o.al.4��:1'rY�:��'.'��;:�rl8int. <br /> . �7;. .h L�o. � <br /> 1. Select number of perforated laterals ''�� ' '�.;� <br /> arter inch erforarions s aced�3 �w +. � <br /> - � � , � c°ni� t t' -0rti; <br /> �� ����.z������r,��.a� 4 G� ut r�0� .4 yn {oc� q�. <br /> ��il'7UR���c�y 7�,x1�1j�l� �-JQL x�}'vb.�����U til}J l.G -�Cn <br /> 2. Select perforation spacing = � feet. �,«�,�,�` ,� � ,r ob�� u,, re,i „�� ,> �< < �� <br /> .aaacu.:nti.I.17(}.1(�T 7:a,q: J32�� .7 Gr�a�,� <br /> Perf Sizing 7/32"-1/4" <br /> 3. Since perforations should not be placed closer than 1 ft. to Perf Spacing 1.5�-s� <br /> the edge of the rock layer (see diagram),subtract 2 ft. from <br /> the rock layer length. Perforatlon Dlscharges in gpm <br /> , t perforatibn dlameter <br /> o� ayer eng ��lt. = feet. head inches <br /> � (feet) 1/8" 3/16 7/32 1/4 <br /> 4. Determine the number of spaces between perforations. t.o� 0.18 0.42 0.56 �0.74, <br /> Divide the length above by perforation spacing and round b <br /> down to nearest whole number. 2•0 0.26 0.59 0.s0 1.04 <br /> 5.0 0.41 0.94 1.26 1.65 <br /> Length perf. spacing = ft. 1- ft. = Sp 1CeS a use�.o foot tor s�n9�e-tomuy nomes. <br /> �3� �2� b Use 2.0 feet for anything else. <br /> • Potentlal for plugging <br /> 5. Number of perforations is equal to one plus.the number of <br /> perforation spaces . _ � <br /> , , Maximum number of quarter inch perforarions pe <br /> spaces + 1 = � perforations/lateral lateral to guarnantee<10%discharge variation <br /> Perforation <br /> 6. Multiply perforations per lateral by number of laterals to � S�fe�g l� 1� 2 <br /> get total number of perforations. , 2,.5 14 18 28 <br /> � ' perforations. 3.0 13 17 26 <br /> atera X per s ater 3.3 12 16 �� <br /> Calculate the square footage per perforation (6-10 sqft/per� 4.0 11 1J� 23 <br /> System area: ' x = � 5.� 1� 14 22 <br /> area er ora o <br /> - sqfdperf <br /> M4NIfpLD IOCATED AT END Of PRESSURE O�STRIBUTION SYSTEM <br /> 7. Determine required flow rate by multiplying, <br /> number of perforations by flow per perforation ���° <br /> .. nn reow <br /> T�pi" <br /> ., '.. . i ,. . .� <br /> � �� _ ,� � �,�,. <br /> �. <br /> '�� X SPm Per - � gp . �,�"'` i�",,�P�.� <br /> 8. If laterals are connected to header pipe as shown on upper ��``�TM d <br /> example, to select minimum required lateral diameter; enter <br /> table with perforation spacing and number of perforations VVpUT OF/ERfOMiEO►IK LATEN�LS roA <br /> MESSURE D1lTPIBUTId1 W MOUNO <br /> per lateral. Select minimum diameter for ,�„�,,,�,,,,,,K,,,� <br /> perforated lateral= � inches. ' ��"° <br /> [uo n��T��s.aj� ^�ppra+ <br /> v�tw '"' r <br /> �r e <br /> 9. If perforated lateral system is attached to manifold pipe near .��;�-��p•�« <br /> the center, lower diagram,perforated lateral length and '° � - •-�;�•���,s���;.�„ <br /> number of perforations per lateral will be approxirriately one �,��, �. ��,� <br /> half of that in step 8. Using these va�ues,select minimum �,,.���"'"°`� �"'���"� <br /> diameter for perforated lateral= :''' � inches. � <br />