Laserfiche WebLink
CITY OF ORONO SEPTIC SYSTE�S PERi1-IIT APPLICATIO�' <br /> Box 66 (2750 Kelley Parkway) <br /> Crystal Bay, NIN 5�323 <br /> JOB SIT'E ADDRESS: � � C� ��l�l�v,'e u1 �� � <br /> Occupancy Type: Residential I/ Commercial Other <br /> Permit Tti�pe: IV'e�v or Replacement Sy�stem, $100.00 �-'' <br /> Repa.ir ExistinD System, $ �0.00 <br /> (Tanks or Drainfield) <br /> 0.�0 State surcharge added to above fees <br /> *See fee schedule for non-residential permit fees <br /> , T �� �� �j Phone Number: `-�7 3 - � �S/ <br /> O�mer s I�ame: , �v om�5 `� �.c- � <br /> Nlailing Address: �f �� L�;l� Sf - City: C�y �z4 h- 7iP: �s351 <br /> Contractor's �'ame: �, c S�� Phonel�'umber: �-/7�l-i��> �- <br /> I1�iailing Address: z� � ��Sf -s �- _ City: /'��n f�s-c 7�P�_-z� <br /> DO \TOT 1�SA]I, J'AYI�'IENT `VITH THIS APPLICATIO�' <br /> GENERAL I�TSTRUCTIONS <br /> 1. Applications for septic system permits may be mailed or submitted in person at the Ciry <br /> Offices; however, permits will not be mailed out. The permit must be picked up in <br /> person at the Ciry Offices and work must not be?in unless the permit card is on the job <br /> site. <br /> 2. permits �•ill be issued only to contractors holding a City of Orono Septic System <br /> Installers License. <br /> 3. All work must be done in accordance with the approved septic system desi;n. Design <br /> reports are not considered approved unless accompanied by the "City of Orono Septic <br /> System Approval" cover sheet si�ned by the City Inspector. <br /> 4, The followinJ inspec[ions will be required for all septic systems: <br /> A. Pre-i.nscallation site inspection to include inspector, installer, and general contractor. <br /> B. Tank installation prior to coverin�. <br /> C. Drainfield trench installation prior to coverin�. For mounds, inspection is required <br /> after rough-up buc prior to sand placement (sand will be jar tested for silt content), <br /> and a�ain durin� pressure distribution pipinJ installation in the rock bed. <br /> D. Final inspection to verify proper final cover depths and to verify that all pump station <br /> (where required) components are functional and comply wi[h codes. <br /> 5, Individual holdin�MPCA Installer Certificate shall be presen[ durin� inspections: A 24' <br /> hour notice is required for all inspections. <br />