Laserfiche WebLink
`��� �� <br /> . ` �U�; � �� . <br /> CITY OF ORONO SEPTIC SYSTEM PERNIIT APPLICATION <br /> Box 66 (2750 Kelley Parkway) <br /> Crystal Bay,Mn 55323 r <br /> JOB STTE ADDRESS � 2 �} -� �� <br /> ���=2c �'V L �Ctl\ �`� <br /> Occupancy Type: Residential�_ Commercial Other <br /> Permit Type: New or Replacement System $100.00 <br /> Repair Existing System $ 50.00 <br /> (Tanks or Drainfield) <br /> $0.50 State surcharge added to above fees <br /> * See fee schedule for non-residential permit fees <br /> Owner's Name: s��r�� /tc n ��-� ��� Phone Number: <br /> Mailing Address: 12� `� •�.h=� C�-.�� O� City: Zip: <br /> Contractor's Name: /_/,..� r �.�N����r s�.� C` Phone Number: ?G J � y 7�. -2�F zv. <br /> � <br /> Nlailing Address: *�,�l �( f��->� � /?� = S_� City:C��%��,� Zip• ��7 32f; <br /> *** DO NOT MAIL PAYMENT`VITH THIS APPLICATION*** <br /> GENERAL INSTRUCTIONS <br /> 1. Applications for septic system permits may be mailed or submitted in person at the City <br /> Offices; however, permits will not be mailed out. The permit must be picked up in person <br /> at the City Offices and work must not begin unless the permit card is on the job site. <br /> 2. Permits will be issued only to contractors holding a Minnesota Pollution Control <br /> A�ency(MPCA) Septic System Installers License. <br /> 3. All �vork must be done in accordance with the approved septic system design. Design reports <br /> are riot considered approved unless accompanied by the "City of Orono Septic System <br /> Approval" cover sheet signed by the City Inspector. <br /> 4. The following inspections will be required for all septic systems: <br /> A. Pre-installation site inspection to include inspector, installer, and general contractor. <br /> B. Tank installation prior to covering. <br /> C. Drainfield trench installation prior to covering. For mounds, inspection is required after <br /> rough up but prior to sand placement(sand will be jar tested for silt content), and again <br /> during pressure distribution piping installation in the rock bed. <br /> D. Final inspection to verify proper final cover depths and to verify that all pump stations <br /> (where required) components are functional and comply with codes. <br /> 5. Individual holdin��IPCAInstallers License shall be present during all inspections. A 24-hour <br /> notice is required for all inspections. <br />