Laserfiche WebLink
A 1250 galton pumping chamber wilt need io be installed to IiR the effluent to#he <br /> treatrnent area. The power supply and switches must be located outside the manhole <br /> and pumping chamber in a weather proof enclosure. A warning device must be <br /> installed with a light and sound device,this is in case of a pump failure. <br /> The manifold and suppiy line pipe must have back drainage to the pumping chamber. <br /> The distribution pipes shalt have their ends capped. Be sure the rock and sand fill <br /> material are clean. The sod layer below the entire mounded area must be turned over, <br /> just break up the sod,be sure not to over work. <br /> If the tanks have less than 2'of cflver,#he lids,risers&maintenance hole covers must <br /> be insulated to a value of R10. <br /> An effluent screen may be needed at the outlet of the 2nd tank,which needs to be <br /> cleaned 2 times a year if a garbage disposal is installed. <br /> Cleanouts for each later must be installed&be accessible from finish grade in an <br /> imgation box with a ball valve. � <br /> A�I neighboring wells are located greater than 100'away from the proposed treatment <br /> area. <br /> Keep atl heavy equipment of#of the proposed treatment area before and after <br /> construction. The treatment area should be ma�iced off before construction. This <br /> Design is not valid&the system wi11 need to be relocated if failure to protect the areas <br /> proposed for On-Site Sewage Treatment occurs. <br /> RAaNa�FM�NT PLaNS: <br /> The tanks need to be pumped every 2 years. Check with your pumper to set up a <br /> schedule. <br /> System inspec#ed for wet areas by owner&or lnspector as determined by the local unit <br /> o#govemment. <br /> Any other requirements as determined by the local unit of government <br /> 2 <br />