My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-00434 - septic - new
Orono
>
Property Files
>
Street Address
>
G
>
Golden View Drive
>
55 Golden View Drive - 33-118-23-43-0011
>
Septic
>
2013-00434 - septic - new
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:52:04 PM
Creation date
12/27/2016 12:25:09 PM
Metadata
Fields
Template:
x Address Old
House Number
55
Street Name
Golden View
Street Type
Drive
Address
55 Golden View Drive
Document Type
Septic
PIN
3311823430011
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A 1250 galton pumping chamber wilt need io be installed to IiR the effluent to#he <br /> treatrnent area. The power supply and switches must be located outside the manhole <br /> and pumping chamber in a weather proof enclosure. A warning device must be <br /> installed with a light and sound device,this is in case of a pump failure. <br /> The manifold and suppiy line pipe must have back drainage to the pumping chamber. <br /> The distribution pipes shalt have their ends capped. Be sure the rock and sand fill <br /> material are clean. The sod layer below the entire mounded area must be turned over, <br /> just break up the sod,be sure not to over work. <br /> If the tanks have less than 2'of cflver,#he lids,risers&maintenance hole covers must <br /> be insulated to a value of R10. <br /> An effluent screen may be needed at the outlet of the 2nd tank,which needs to be <br /> cleaned 2 times a year if a garbage disposal is installed. <br /> Cleanouts for each later must be installed&be accessible from finish grade in an <br /> imgation box with a ball valve. � <br /> A�I neighboring wells are located greater than 100'away from the proposed treatment <br /> area. <br /> Keep atl heavy equipment of#of the proposed treatment area before and after <br /> construction. The treatment area should be ma�iced off before construction. This <br /> Design is not valid&the system wi11 need to be relocated if failure to protect the areas <br /> proposed for On-Site Sewage Treatment occurs. <br /> RAaNa�FM�NT PLaNS: <br /> The tanks need to be pumped every 2 years. Check with your pumper to set up a <br /> schedule. <br /> System inspec#ed for wet areas by owner&or lnspector as determined by the local unit <br /> o#govemment. <br /> Any other requirements as determined by the local unit of government <br /> 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.