My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-00112 - new structure
Orono
>
Property Files
>
Street Address
>
G
>
Glendale Cove Lane
>
2385 Glendale Cove Lane- 34-118-23-33-0069
>
Permits/Inspections
>
2014-00112 - new structure
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:57:11 PM
Creation date
12/20/2016 3:20:43 PM
Metadata
Fields
Template:
x Address Old
House Number
2385
Street Name
Glendale Cove
Street Type
Lane
Address
2385 Glendale Cove Lane
Document Type
Permits/Inspections
PIN
3411823330069
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
_ _ . � .�—R: ----�.� . . <br /> � <br /> � �� i,� 1J <br /> '" Daily Soil Observation Notes <br /> Project No: Date: Report No: <br /> Project Name: Project Location: <br /> Client: Temp/Weather: <br /> Project Manager: Time Arrived: Departed: <br /> Areas Observed: ❑ Building Pad ❑House Pad ❑Roadway ❑Parking/Walks ❑ Footing <br /> ❑Proof Roll ❑Other(describe): <br /> Soil report available? ❑ Yes ❑No Report reviewed? ❑Yes ❑No Report prepared by: <br /> Finish floor evaluation: Bottom of footing elevation: Bottom of excavation elevation: <br /> Approved plans available? ❑Yes ❑No Specified compaction: Fili source: <br /> "Dversizing appears adequate? ❑NA ❑Yes ❑No Soils observed agree with Soils report? ❑Yes ❑No <br /> S <br /> Soils appear adequate for design loads? ❑Yes ❑No Proposed project bearing capacity(psf): <br /> Contractor notified of results? ❑Yes ❑No Name of person notified: <br /> Was a copy of this report left on site? ❑Yes ❑No If so,whom was it submitted to? <br /> � -- - - — <br /> Notes/Comments <br /> Performed By: Reviewed By: Date: <br /> This is a preliminary report and is provided solely as evidence that field observations and/or testing was performed.Observations and/or conclusions and/or <br /> recommendation conveyed in the final report may vary from,and shall take precedence over,those indicated in a preliminary report. <br />
The URL can be used to link to this page
Your browser does not support the video tag.