Laserfiche WebLink
_ _ . � .�—R: ----�.� . . <br /> � <br /> � �� i,� 1J <br /> '" Daily Soil Observation Notes <br /> Project No: Date: Report No: <br /> Project Name: Project Location: <br /> Client: Temp/Weather: <br /> Project Manager: Time Arrived: Departed: <br /> Areas Observed: ❑ Building Pad ❑House Pad ❑Roadway ❑Parking/Walks ❑ Footing <br /> ❑Proof Roll ❑Other(describe): <br /> Soil report available? ❑ Yes ❑No Report reviewed? ❑Yes ❑No Report prepared by: <br /> Finish floor evaluation: Bottom of footing elevation: Bottom of excavation elevation: <br /> Approved plans available? ❑Yes ❑No Specified compaction: Fili source: <br /> "Dversizing appears adequate? ❑NA ❑Yes ❑No Soils observed agree with Soils report? ❑Yes ❑No <br /> S <br /> Soils appear adequate for design loads? ❑Yes ❑No Proposed project bearing capacity(psf): <br /> Contractor notified of results? ❑Yes ❑No Name of person notified: <br /> Was a copy of this report left on site? ❑Yes ❑No If so,whom was it submitted to? <br /> � -- - - — <br /> Notes/Comments <br /> Performed By: Reviewed By: Date: <br /> This is a preliminary report and is provided solely as evidence that field observations and/or testing was performed.Observations and/or conclusions and/or <br /> recommendation conveyed in the final report may vary from,and shall take precedence over,those indicated in a preliminary report. <br />