Laserfiche WebLink
� � r <br /> Nail the floor sheathing to the <br /> blocking w/at least(12)0.131" <br /> diameter x 3"long nails evenly <br /> spaced Wall framing,trusses, &structural <br /> rim by others <br /> � __.. . _.....____._.. _...���_ . __ � <br /> __ .��. <br /> ,See note 4 for spacers as required <br /> at mechanical only <br /> . • • . .�..-� <br /> i� <br /> ��� ��� ���.� ��.���� ,��Use Class D connection from S3 <br /> for blocking to sill <br /> � -Nail rim truss bottom chord to sill <br /> H�����°����. � �v..�. � � • plate w/0.148"diameter x 3"long <br /> ,. . <br /> = nails @ 6"o.c. <br /> tiw• <br /> � <br /> Install 2x4 minimum flat blocking <br /> between trusses as required to <br /> achieve the nailing noted 2x6 minimum sill plate w/1/2" <br /> (minimum of two spaces),spaces diameter anchor bolts w/T' <br /> used do not need to be next to minimum embed&2"wide x 1/8" <br /> each other if spaces between are thick square or round countersunk <br /> blocked per note 4 flush washers or alternative anchor <br /> (see table on S2 for spacing) <br /> (Anchor bolt clearance between <br /> Install 3/4"minimum thick OSB/plywood to one `` edge of both wall and sill plate is to <br /> side of 2x4 blocking w/(6)0.131"diameter x 3" be 2.5"), NOTE: Sill plate may <br /> long nails top&bottom OR 1/2"minimum thick have to be increased to Dc8 to fit <br /> OSB/plywood to each side w/(4)0.131" Class D connectors <br /> diameter x 3"long nails top&bottom <br /> BOTTOM CHORD BEARING TRUSS BLOCKING DETAIL <br /> Blocking spacing to match anchor bolt spacing (see S2) <br /> NOTES: <br /> 1. Floor sheathing is to be 3/4"minimum thick o6B/plywood installed in a staggered pattern. f�il to floor members with 0.131"diameter x <br /> 3"long nails at 6"o.c.at all panel edges/perimeter and 12"o.c. at all intermediate supports or an appro�ed equivalent. <br /> 2. Blockinq shown may be replaced with pre-manufactured blockinq provided it can resist at least 1500 pounds of lateral compression. <br /> 3. Toe nail blockinq members in place as required for stabilty. <br /> 4. Bays containing blocking do not need to be directlynext to the wall or each other prouded 2x4 spacer blocking is installed between <br /> them as shown. Toe nail spacers in place as required. <br /> 5. OSB/plywood blocking maycontain 4"diameter ma�amum holes if required for electrical/plumbing. R�ovide at least 3"edge clearance <br /> for all holes. <br /> 6. All nails are to be spaced in members such that splittinq does not occur. <br /> 7. Foundation wall is to be per Code bv others. <br /> 8. Do not cut rim truss bottom chord br any reason. <br /> Oswell Engineering and Consulting,L.L.G 1901 E Hennepin Ave,#201 ` � _ <br /> Project Name: 2014 Standardized Top of Foundation Support Drawings Minneapolis, MN 55413 "� <br /> Description: Non-Bearing Wall Bottom Chord Bearing Truss Blocking Detail(NOT TO SCALE) Phone:612-720-4639 �� <br /> Project# 13.100 Fax:612-886-2966 �� <br /> �._ <br /> =:.�.: <br /> Client Name: Abfalter Brothers Concrete LLC www.oswelleacom ^ <br /> Client Address: 15546 Cleveland Street, Elk River, MN 55330 Page S5 of S6 � �,� ��f <br /> 1/1/2014 <br />