My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Refunding of escrow
Orono
>
Property Files
>
Street Address
>
F
>
Fox Street
>
2801 Fox Street - 04-117-23-34-0004
>
Correspondence
>
Refunding of escrow
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 5:12:53 PM
Creation date
12/19/2016 11:30:14 AM
Metadata
Fields
Template:
x Address Old
House Number
2801
Street Name
Fox
Street Type
Street
Address
2801 Fox St
Document Type
Correspondence
PIN
0411723340004
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
. Orono, MN Code of Ordinances Page 2 of 13 <br /> Sec. 79-5. - Definitions. <br /> The following terms, phrases, words and their derivatives shall have the meaning ascribed to <br /> them, except where the context clearly indicates a different meaning. When inconsistent with the <br /> context, words used in the present tense include the future tense, words in the plural number <br /> include the singular number, and words in the singular number include the plural number. The <br /> word "shall" is always mandatory and not merely directive. <br /> Citymeans the administrative staff, or its agent, of the City of Orono. <br /> Bestmanagementpractices(BMP)means erosion and sediment control and water quality <br /> management practices that are the most effective and practicable means of controlling, <br /> preventing, and minimizing the degradation of surface water, including construction-phasing, <br /> minimizing the length of time soil areas are exposed, prohibitions, and other management <br /> practices published by state or designated area-wide planning agencies. <br /> Detention facilitymeans a permanent natural or man-made structure, including wetlands, for <br /> the temporary storage of stormwater which contains a permanent pool of water. <br /> Discharge means the release, conveyance, channeling, runoff, or drainage, of stormwater <br /> including snowmelt, from a construction site. <br /> Exposedsoilareasmeans all areas of the construction site where the vegetation (trees, � <br /> shrubs, brush, grasses, etc.) or impervious surface has been removed, thus rendering the soil <br /> more prone to erosion. This includes topsoil stockpile areas, borrow areas, and disposal areas <br /> within the construction site. It does not include stockpiles or surcharge areas of gravel, concrete <br /> or bituminous. Once soil is exposed it is considered "exposed soil," until it meets the definition of <br /> final stabilization. <br /> Finalstabilization means that all soil disturbing activities at the site have been completed, and <br /> that a uniform perennial vegetative cover with a density of 75 percent for unpaved areas and <br /> areas not covered by permanent structures has been established, or equivalent permanent <br /> stabilization measures have been employed. Simply sowing grass is not considered final <br /> stabilization. <br /> Land disturbingordeve%pmentactivitiesmeans any change of the land surface including <br /> removing vegetative cover, excavating, filling, grading and the construction of any structure. <br /> Ownermeans a person who owns the land on which land disturbing activities are proposed <br /> about:blank 11/21/2016 <br />
The URL can be used to link to this page
Your browser does not support the video tag.